Concrete and Gravel Deliveries for Jan. 9 - 13

  
January 6, 2017 
 
CONTACT: Marcia McAllister
            T: 703-572-0506
            C: 571-730-9117
 
 
 
Concrete and Gravel Deliveries Scheduled Along Old Ox Rd/Route 606 for Jan. 9 - 13
 
The following construction deliveries are scheduled for Jan. 9 - 13 (Monday - Friday) in support of the MWAA Rail Yard and Maintenance Facility project. The construction deliveries will be made to the Dulles Corridor Metrorail Project, Rail Yard and Maintenance Facility along US Route 606 (Old Ox Road) and Mercure Circle as detailed below:
 
WHAT: RESCHEDULED from 1/3 - Concrete delivery (5-6 trucks) for installation at the Service and Inspection Building Footings (approximately 50 cubic yards).

WHEN: Monday between the hours of 9:00 a.m. to 11:00 a.m.

HOW: Trucks will travel from the Titan batch plant along Old Ox Rd/Rt. 606 to the
project site.
 
----------------------------------------------------------------------------------------
 
WHAT: Concrete delivery (30-35 trucks) for installation at the Service and Inspection
Building Wheel Truing Pit Upper Slab (approximately 300 cubic yards). This will
include a 47 Meter Pump Truck.

WHEN: Thursday and Friday between the hours of 7:00 a.m. to 10:00 a.m.

HOW: Trucks will travel from the Titan batch plant along Old Ox Rd/Rt. 606 to the
project site.
 
----------------------------------------------------------------------------------------
 
WHAT: Structural Steel Delivery (5-6 Trucks) for installation in the Service and
Inspection Building.

WHEN: Tuesday between the hours of 6:00 a.m – 10:00 a.m.

HOW: Trucks will be coming from Tennessee, traveling North on Old Ox Rd/Rt. 606
from US 50.
 
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2, Package B construction-related issues: 952-939-6690. For general project information: www.dullesmetro.com or 703-572-0506.