Skip to main content
Silver Line on Track

Concrete and Gravel Deliveries Scheduled Along Old Ox Rd/Route 606 for April 17 - 21

April 14, 2017
 
CONTACT: Marcia McAllister
           T: 703-572-0506
           C: 571-730-9117
 
Concrete and Gravel Deliveries Scheduled Along Old Ox Rd/Route 606 for April 17 - 21
 
The following construction deliveries are scheduled for April 17 - 21 (Monday - Friday) in support of the MWAA Rail Yard and Maintenance Facility project. The construction deliveries will be made to the Dulles Corridor Metrorail Project Rail Yard and Maintenance Facility along US Route 606 (Old Ox Road) and Mercure Circle as detailed below:
 
WHAT: Stone delivery (15-20 trucks) of ballast material at the layup yard.

WHEN: Monday - Friday between the hours of 7 a.m. and 5 p.m.

HOW: Trucks will travel from Chantilly, coming from Rt. 50, North on Old Ox Road/Rt.
606 to the project site.
-----------------------------------------------------------------------------------------
WHAT: Turnout delivery (2 trucks) for installation in the yard lead track.

WHEN: Monday, Tuesday, Thursday and Friday between the hours of 7 a.m. and noon

HOW: Trucks will travel from Reading, PA, West on Rt. 267, South on Rt. 606/Old Ox
Road, and will have to turn around at Mercure Circle to make the right into the
job site.
-----------------------------------------------------------------------------------------
WHAT: Concrete delivery (8-10 trucks) for installation at the Service and Inspection
Building (approximately 80-100 cubic yards), including a 36m Pump Truck.

WHEN: Tuesday between the hours of 6 a.m. and noon

HOW: Trucks will travel from the Titan batch plant along Old Ox Road/Rt. 606 to the
project site.
-----------------------------------------------------------------------------------------
WHAT: Precast Panel Delivery (10 Trucks) in 45 minute increments for installation at
the Service and Inspection Building.

WHEN: Monday - Friday between the hours of 7:00 a.m. to 2:00 p.m.

HOW: Trucks will travel from Winchester VA, East on Rt. 7, South on Rt. 28 and West
along Old Ox Road/Rt. 606 to the project site, making the U-Turn at Mercure 
Circle to make the right into the job site.
-----------------------------------------------------------------------------------------
WHAT: Structural Steel Delivery (1 Truck) for installation in the Service and
Inspection Building.

WHEN: Monday-Tuesday between the hours of 6 a.m. and noon

HOW: Trucks will be coming from Tennessee, traveling North on Old Ox Road/Rt. 606
from Rt. 50.
-----------------------------------------------------------------------------------------
WHAT: Structural Steel Delivery (2 Trucks) for installation in the Transportation and Police Building.

WHEN: Wednesday between the hours of 6 a.m. and noon

HOW: Trucks will be coming from Tennessee, traveling North on Old Ox Road/Rt. 606
from Rt. 50.
-----------------------------------------------------------------------------------------
WHAT: Joist and deck delivery (1 truck) for installation at the Service and Inspection
Building.

WHEN: Monday between the hours of 7 a.m. to 5 p.m.
 
HOW: Trucks will travel from South Carolina, North on I-95, West on the Dulles Toll
Road, West along Old Ox Road/Rt. 606, turning around at Mercure Circle to turn
right into the project site.
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2, Package B construction-related issues: 952-939-6690. For general project information: www.dullesmetro.com or 703-572-0506.