Skip to main content
Silver Line on Track

Daily Traffic Reminder for Aug. 17

Aug. 17, 2018
 
CONTACT:  Marcia McAllister
                    T: 703-572-0506
                    C: 571-730-9117
                    marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures on Eastbound Dulles Greenway - Friday, Aug. 17
 
On Friday night, Aug. 17, Silver Line Phase 2 work will continue along the eastbound Dulles Greenway, requiring a double lane closure. Please see below for more detailed information.
 
All work is weather dependent and subject to change.
 
PLEASE DRIVE CAREFULLY! Drivers are asked to use caution and pay attention to all police and flagger instructions, signage, and barricades. Large, slow-moving vehicles may be exiting and entering the highways at various times.
 
Dulles Greenway East
 
When:   Friday, Aug. 17, 5 p.m. to 5 a.m.
What:    Two left lanes closed
Where:  From mile marker 10.5 to 12.1 (from 5/10 mile before the Old Ox Road overpass to 3/10 mile before the main toll plaza)
Why:     Paving 
 
{"gmap":{"map":{"options":{"center":"(38.99017718015812, -77.452493244435)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.9928912677541, -77.46348283586508)"},"marker1":{"position":"(38.97754894123019, -77.44929438370826)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.