DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles Toll Road, Dulles International Airport Access Highway, Dulles Greenway and Airport Roads – Friday, Dec. 2
 
Nighttime construction activities will take place on Friday, Dec. 2, causing lane and road closures on the Dulles Toll Road, Dulles International Airport Access Highway, Dulles Greenway and airport roads.
On or about Friday, Dec.2 at 10 p.m. and continuing until Saturday, Dec. 3 at 8 a.m., the eastbound Dulles Greenway will be detoured to Exit 8A (Old Ox Road east/Route 606). Follow detour signs along eastbound Old Ox Road and Route 28 south to Dulles International Airport or the Dulles Toll Road. Police will be present for safety.  Rolling left lane closures will occur on the westbound Dulles Greenway from the mainline toll booth and continuing for approximately 7/10 mile.
Drivers are asked to use caution remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. 
 
All work is weather dependent.
 
Dulles Toll Road West
 
When:   Friday, Dec. 2 - Saturday, Dec. 3, 8 p.m. to 5 a.m.
What:    Left lane closed; slip ramp to the westbound DIAAH at mile marker 1.8 will remain open.
Where:  From mile marker 2.7 to 1.8 (from 1/10 mile before the Centreville Road bridge to 6/10 mile before the Route 28 overpass)
Why:    Jack and bore operations
 
{"gmap":{"map":{"options":{"center":"(38.96067102243604, -77.41535570718383)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95610502387524, -77.40194320678711)"},"marker1":{"position":"(38.959542274774726, -77.41164207458496)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Friday, Dec. 2 - Saturday, Dec. 3, 10 p.m. to 4 a.m.
What:    Full closure begins at 10 p.m.; follow detour. Road reopens at 4 a.m.
Where:  From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass)
Why:     Installation of a concrete span across the eastbound DIAAH
 
{"gmap":{"map":{"options":{"center":"(38.95863542215025, -77.42533352471924)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.9580072129072, -77.44451522827148)"},"marker1":{"position":"(38.962211868378226, -77.44022369384766)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Friday, Dec. 2 - Saturday, Dec. 3, 6 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 3.3 to 3.9 (from 1/10 mile before the Monroe Street overpass to 3/10 mile before the Fairfax County Parkway overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.95438883826925, -77.38666679956054)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.9535686942725, -77.39160060882568)"},"marker1":{"position":"(38.95256748685515, -77.38132238388062)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Friday, Dec. 2 - Saturday, Dec. 3, 7 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 2.7 to 1.8 (from 1/10 mile before the Centreville Road bridge to 6/10 mile before the Route 28 overpass)
Why:    Jack and bore operations
 
{"gmap":{"map":{"options":{"center":"(38.96140534879115, -77.4210956344757)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95563781300941, -77.40014076101943)"},"marker1":{"position":"(38.96074360434361, -77.41574048995972)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Friday, Dec. 2 - Saturday, Dec. 3, 10 p.m. to 4 a.m.
What:    Full closure
Where:  From mile marker 0.3 to Saarinen Circle (from 2/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1), traffic will be diverted around work area.
Why:    Installation of a concrete span across the westbound DIAAH. 
 
{"gmap":{"map":{"options":{"center":"(38.95791794253901, -77.44381930924988)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.96174469472184, -77.44159698486328)"},"marker1":{"position":"(38.95712286869069, -77.44451522827148)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Cargo Drive North/Aviation Drive East
 
When:   Friday, Dec. 2 - Saturday, Dec. 3, 6 p.m. to 5 a.m.
What:    Two right lanes and turn lane closed, traffic diverted to one southbound lane
Where:  From 300 feet south Aviation Drive to 300 feet east of Autopilot Drive (along the transition from northbound Cargo Drive to eastbound Aviation Drive)
Why:     Duct bank work
 
{"gmap":{"map":{"options":{"center":"(38.959603173839525, -77.44264986611938)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95750664206466, -77.45292663574219)"},"marker1":{"position":"(38.95814069786802, -77.45116710662842)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway East
 
When:   Friday, Dec. 2 - Saturday, Dec. 3, 10 p.m. - 4 a.m.
What:    Full closure of all eastbound lanes
Where:  Single lane closures will begin at mile marker 9.7 (8/10 mile before the Broad Run bridge).  At mile marker 11.0, all traffic will exit the eastbound Dulles Greenway via Exit 8A, Old Ox Road East/Route 606.  Follow detour.
Why:     Installation of a concrete span across the eastbound Dulles Greenway
 
{"gmap":{"map":{"options":{"center":"(39.00078710394841, -77.48167064286804)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(39.00647907874192, -77.49283790588379)"},"marker1":{"position":"(38.99887522757026, -77.48116493225098)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway West
 
When:   Friday, Dec. 2 - Saturday, Dec. 3, 10 p.m. - 4 a.m.
What:    Rolling left lane closures
Where:  From the mainline toll booth to mile marker 11.7 (7/10 mile before the Old Ox Road overpass)
Why:     Installation of a concrete span across the eastbound Dulles Greenway
 
{"gmap":{"map":{"options":{"center":"(38.988512828993194, -77.4671652565155)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.981530053564654, -77.45331287384033)"},"marker1":{"position":"(38.98675073094476, -77.47015714645386)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
                                                                   <><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.