Skip to main content
Silver Line on Track

Daily Traffic Reminder for Friday, December 4, 2015

 

December 4, 2015

CONTACT: Marcia McAllister
                  T: 703-572-0506
                  C: 571-730-9117
                  marcia.mcallister@dullesmetro.com

DULLES CORRIDOR METRORAIL PROJECT

Lane Closures Tonight on the Dulles International Airport Access Highway, Airport Roads and Centreville Road – Friday, December 4

Nighttime construction activities will take place on Friday, December 4, causing lane closures along the Dulles International Airport Access Highway, Autopilot Drive and Centreville Road

Lane closures on the eastbound DIAAH as it leaves the airport will begin at 9 p.m.  From 10 p.m. to 5 a.m., traffic will be diverted to eastbound Aviation Drive, and then to the new ramp at the north end of Windsock Drive to access the eastbound DIAAH and the Dulles Toll Road.

Between 9 p.m. to 5 a.m., the northbound and southbound lanes of Autopilot Drive just north of the Advantage driveway and just south of the Budget driveway will be closed to allow work to continue on the Dulles Corridor Metrorail Project Aerial Guideway. Detour signage, flaggers and police will be in place to guide local and through traffic to their destination. 

Please stay alert, obey all signage and drive carefully.

All work is weather dependent and subject to change.

Dulles International Airport Access Highway (DIAAH) East

When:   Friday, December 4 – Saturday, December 5, 9 p.m. to 5 a.m.
What:    Two left lanes closed at 9 p.m.  From 10 p.m. to 5 a.m., full closure of eastbound lanes with traffic diverted to eastbound Aviation Drive then to the new ramp of the eastbound DIAAH
Where:  From mile marker 0.1 to 0.4 (from Saarinen Circle to 1/10 mile before the Rudder Road overpass). Police will be on site for motorist safety.
Why:     Aerial guideway construction

Dulles International Airport Access Highway (DIAAH) West

When:   Friday, December 4 – Saturday, December 5, 7 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 2.6 to 1.6 (from 1/10 mile before the Centreville Road overpass to 4/10 mile before the Route 28)
Why:     Construction entrance acceleration/deceleration lane

When:   Friday, December 4 – Saturday, December 5, 7 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 4.2 to 3.6 (from the Fairfax County Parkway overpass to 2/10 mile before the Monroe Street overpass)
Why:     Construction entrance acceleration/deceleration lane

Autopilot Drive

When:   Friday, December 4 – Saturday, December 5, 9 p.m. to 5 a.m.
What:    Northbound lanes closed and full closure of northbound and southbound lanes at north end of Autopilot Drive.
Where:  Northbound lanes of Autopilot Drive from Rudder Road to Materials Road will be closed. Local traffic to the facilities along Autopilot Drive will be diverted to the southbound lane. Northbound and southbound lanes of Autopilot Drive will be closed from just south of the Budget driveway to just south of the Advantage driveway; traffic will be diverted around the closure as appropriate. Police, flaggers and signage will be in place to direct traffic.
Why:     Superstructures work

<><><><><> 

 

A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.