Skip to main content
Silver Line on Track

Daily Traffic Reminder for Friday, July 29, 2016

 
July 29, 2016
 
CONTACT:  Marcia McAllister
                    T: 703-572-0506
                    C: 571-730-9117
                    marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detour Tonight on the Dulles Toll Road, Dulles International Airport Access Highway, Dulles Greenway and Airport Roads - Friday, July 29
 
Night time construction activities will take place Friday, July 29, causing lane closures and a detour on the Dulles Toll Road, Dulles International Airport Access Highway, Dulles Greenway and Rudder Road.
 
All work is weather dependent.
 
<><><> 
Dulles Toll Road (DTR) East
When:   Friday, July 29 - Saturday, July 30, 9 p.m. to 5 a.m.
What:    Right lane closed
Where:  From the mainline toll booth to mile marker 1.8 (2/10 mile past the mainline toll booth)
Why:    Jack and bore operation
{"gmap":{"map":{"options":{"center":"(38.963273835957104, -77.4255802879486)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.96182812048798, -77.41743564605713)"},"marker1":{"position":"(38.96403047141792, -77.42495656013489)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Toll Road (DTR) West
When:   Friday, July 29 - Saturday, July 30, 8 p.m. to 3 a.m.
What:    Left lane closed
Where:  From mile marker 4.0 to 3.3 (from 2/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Monroe Street overpass
Why:    Duct bank work
{"gmap":{"map":{"options":{"center":"(38.95386321192685, -77.38310482598876)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.953368454327915, -77.37649440765381)"},"marker1":{"position":"(38.95395248740349, -77.39104270935058)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) East
When:   Friday, July 29 - Saturday, July 30, 10 p.m. to 5 a.m.
What:    Eastbound lane reductions begin at 9 p.m.  Eastbound full closure begin at 10 p.m.  Follow detour; EB DIAAH reopens at 5 a.m.
Where:  From Saarinen Circle to mile marker 0.3 (near the Rudder Road overpass)
Why:     Installation of a concrete span across the eastbound DIAAH
{"gmap":{"map":{"options":{"center":"(38.95881896227908, -77.44475271798706)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.96097719383892, -77.44271278381347)"},"marker1":{"position":"(38.95446976982263, -77.44400024414062)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Friday, July 29 - Saturday, July 30, 6 p.m. to 3 a.m.
What:    Left lane closed
Where:  From mile marker 0.3 to 2.3 (from 1/10 mile past the Aviation Drive overpass to 2/10 mile before the Centreville Road bridge)
Why:     Construction entrance acceleration/deceleration lane
{"gmap":{"map":{"options":{"center":"(38.95594900767809, -77.42134239770507)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.95829086814833, -77.40883111953735)"},"marker1":{"position":"(38.96054338416325, -77.44331359863281)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Friday, July 29 - Saturday, July 30, 6 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 4.3 to 5.3 (from 1/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Reston Parkway overpass)
Why:     Construction entrance acceleration/deceleration lane
{"gmap":{"map":{"options":{"center":"(38.94717156481069, -77.36108925439453)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.953151526531194, -77.3708724975586)"},"marker1":{"position":"(38.95133264426656, -77.35254764556885)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
When:  Friday, July 29 - Saturday, July 30, 7 p.m. to 4 a.m.
What:    Right lane closed
Where:  From mile marker 4.0 to 3.3 (from 2/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Monroe Street overpass)
Why:    Road work
{"gmap":{"map":{"options":{"center":"(38.95433043551052, -77.38346960641479)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.95313483975009, -77.37643003463745)"},"marker1":{"position":"(38.95383568117341, -77.39147186279297)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Friday, July 29 - Saturday, July 30, 7 p.m. to 3 a.m.
What:    Right shoulder closed
Where:  From mile marker 1.8 to 1.6 (from 6/10 mile before the Route 28 overpass, continuing for 2/10 mile)
Why:    Road work
{"gmap":{"map":{"options":{"center":"(38.96027058109614, -77.42889549829101)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.96227860692957, -77.4202036857605)"},"marker1":{"position":"(38.960993878773394, -77.41567611694336)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Friday, July 29 - Saturday, July 30, 9 p.m. to 5 a.m.
What:    Two left lanes closed; right lane diverted around work area. Traffic on ramp from Aviation Drive must stop.
Where:  From mile marker 0.4 to Saarinen Circle (from Rudder Road overpass to Saarinen Circle near Garage 1)
Why:    Installation of a concrete span across the westbound DIAAH. 
{"gmap":{"map":{"options":{"center":"(38.95603243823133, -77.44638350106811)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.961644588153575, -77.4429702758789)"},"marker1":{"position":"(38.9554042059122, -77.44670391082763)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Rudder Road West
When:   Friday, July 29 - Saturday, July 30, 6 p.m. to 4 a.m.
What:    Right lane closed
Where:  From the ramp from the westbound DIAAH to Ariane Way/Blue Lot access road
Why:     Duct bank work
 {"gmap":{"map":{"options":{"center":"(38.96273159102467, -77.44344379998779)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.96381357625947, -77.44335651397705)"},"marker1":{"position":"(38.964923071426625, -77.44672536849975)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway East
When:  Friday, July 29 - Saturday, July 30, 8 p.m. to 6 a.m.
What:   Right lane closed
Where: From mile marker 11.0 to 10.4 (from the Old Ox Road overpass to 1/10 mile past the Broad Run bridge)
Why:    Road work
{"gmap":{"map":{"options":{"center":"(38.98552732343337, -77.46327068902587)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.993838893835914, -77.46837615966797)"},"marker1":{"position":"(38.990903646610384, -77.45863437652588)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
                                                                    <><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.