Skip to main content
Silver Line on Track

Daily Traffic Reminder for Friday, March 10

March 10,  2017
 
CONTACT:    Marcia McAllister
                      T: 703-572-0506
                      C: 571-730-9117
                      marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles International Airport Access Highway, Dulles Greenway and Airport Roads - Friday Night, March 10 - Sunday, March 12 
 
Construction activities will take place Friday night, March 10 - Sunday, March 12, causing lane closures and detours on the Dulles International Airport Access Highway, Dulles Greenway and airport roads.
 
Saturday, March 11 at 10 p.m. and continuing until Sunday, March 12 at 8 a.m., the eastbound Dulles Greenway will be detoured to Exit 8A (Old Ox Road east/Route 606). Follow detour signs along eastbound Old Ox Road and Route 28 south to Dulles International Airport or the Dulles Toll Road. Police will be present for safety.
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
See below for more detailed information.  All work is weather permitting.
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Friday, March 10 - Saturday, March 11, 10 p.m. to 5 a.m.
What:    Full closure begins at 10 p.m.; follow detour. Road reopens at 5 a.m.
Where:  From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.960537542238725, -77.44037535287475)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.961644588153575, -77.44301319122314)"},"marker1":{"position":"(38.95550432333387, -77.44614601135254)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Friday, March 10, 6 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 4.7 to 5.7 (from 5/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Reston Parkway overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.951093180275436, -77.35661532975769)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95258417383351, -77.35960721969604)"},"marker1":{"position":"(38.95171644899698, -77.35441446304321)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Friday, March 10, 6 p.m. to 5 a.m.
What:    Right shoulder closed
Where:  From mile marker 4.7 to 5.7 (from 5/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Reston Parkway overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.951093180275734, -77.35681917764282)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95263423449029, -77.36035823822021)"},"marker1":{"position":"(38.95106564742718, -77.35168933933892)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Saturday, March 11, 10 a.m. to 3:30 p.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 3.3 to 5.2 (from 1/10 mile before the Monroe/Van Buren Street overpass to the Reston Parkway overpass)
Why:     Civil work
 
{"gmap":{"map":{"options":{"center":"(38.953362611812544, -77.35930826760864)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.952667608284266, -77.3851203918457)"},"marker1":{"position":"(38.95223374773654, -77.35713958740234)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Aviation Drive West/Cargo Drive South
 
When:   Friday, March 10, 6 p.m. to 5 a.m.
What:    Two right lanes and turn lane closed
Where:  From 300 feet west of Autopilot Drive to 300 feet south of Cargo Drive (along the transition from westbound Aviation Drive to southbound Cargo Drive)
Why:     Duct bank work
 
{"gmap":{"map":{"options":{"center":"(38.95409682410381, -77.44593288995361)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.958207440254114, -77.45005130767822)"},"marker1":{"position":"(38.954736752819755, -77.45288372039795)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway East
 
When:   Friday, March 10, 8 p.m. to 5 a.m. and Saturday, March 11, 8 p.m. to 5 a.m.
What:    Two left lanes closed beginning at 8 p.m.  At 10 p.m. a full detour onto at Exit 8A (Old Ox Road/east/Route 606) will be implemented. Follow detour signs.
Where:  From mile marker 10.0 to 12.0 (from the 5/10 mile before the Broad Run bridge to 4/10 mile before the mainline toll plaza)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.99521724843922, -77.47138150573278)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.98032907650648, -77.45251893866225)"},"marker1":{"position":"(39.001109779435076, -77.48481273651123)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Saturday, March 11, 7 a.m. to 3:30 p.m.
What:    Alternating right and left lane closures of varying lengths
Where:  Between mile marker 7.6 and 14.0 (from Broadlands Boulevard to the end of the ramp to the eastbound Dulles Toll Road), short lane closures of varying lengths will occur
Why:     Road work
 
{"gmap":{"map":{"options":{"center":"(39.015776842054784, -77.50401880838012)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(39.02406818931228, -77.50603437423706)"},"marker1":{"position":"(39.01248154184429, -77.50094890594482)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway West
 
When:   Saturday, March 11, 6 a.m. to 3:30 p.m.
What:    Alternating right and left lane closures of varying lengths
Where:  Between mile marker 12.2 and 7.6 (from 2/10 mile after the mainline toll plaza to Broadlands Boulevard), short lane closures of varying lengths will occur
Why:     Road work
 
{"gmap":{"map":{"options":{"center":"(39.02054488022513, -77.50084307290649)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.97705964686268, -77.44790554046631)"},"marker1":{"position":"(39.02388481831271, -77.50592708587646)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.