Skip to main content
Silver Line on Track

Daily Traffic Reminder for Friday, March 17

March 17,  2017
 
CONTACT:      Marcia McAllister
                      T: 703-572-0506
                      C: 571-730-9117
                      marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles International Airport Access Highway and Dulles Greenway -- Friday, March 17
 
Nighttime construction activities will take place Friday, March 17, causing lane closures on the Dulles International Airport Access Highway and Dulles Greenway.
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
See below for more detailed information.  All work is weather permitting.
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Friday, March 17 - Saturday, March 18, 6 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 4.7 to 5.6 (from 5/10 mile past the Fairfax County Parkway overpass to 4/10 mile past the Reston Parkway overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.94996260913937, -77.34822001554107)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.9510990229783, -77.35173225402832)"},"marker1":{"position":"(38.95025631121859, -77.34836339950562)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Friday, March 17 - Saturday, March 18, 6 p.m. to 5 a.m.
What:    Right shoulder closed
Where:  From mile marker 5.0 to 5.4 (from 2/10 mile before the Reston Parkway overpass to 2/10 mile past the Reston Parkway overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.951635514272176, -77.35678699113464)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.952751042700505, -77.36130237579346)"},"marker1":{"position":"(38.9510990229783, -77.35153913497925)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Friday, March 17 - Saturday, March 18, 6 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 2.5 to 2.0 (from the Centreville Road bridge, continuing for 5/10 mile)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.95971162794617, -77.41249110795593)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95683920877404, -77.40477561950684)"},"marker1":{"position":"(38.96132757663797, -77.41734981536865)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway East
 
When:   Friday, March 17 - Saturday, March 18, 8 p.m. to 5 a.m.
What:    Two right lanes closed
Where:  From mile marker 10.0 to 12.0 (from the 5/10 mile before the Broad Run bridge to 4/10 mile before the mainline toll plaza)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.977412450117505, -77.45107200242614)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.99634042890462, -77.47653007507324)"},"marker1":{"position":"(38.98001214860784, -77.4522614479065)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.