Skip to main content
Silver Line on Track

Daily Traffic Reminder for July 18

July 18, 2018
 
CONTACT:  Marcia McAllister
                    T: 703-572-0506
                    C: 571-730-9117
                    marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Nighttime Lane Closures on Eastbound Dulles Access Highway and Dulles Greenway - Wednesday, July 18
 
On Wednesday night, July 18, Dulles Corridor Metrorail Project crews will perform sign installation work over the Dulles International Airport Access Highway (DIAAH), requiring a triple lane closure on the eastbound DIAAH. Aerial guideway work will continue along the eastbound Dulles Greenway, requiring a double lane closure. Please see below for more detailed information.
 
All work is weather dependent and subject to change.
 
PLEASE DRIVE CAREFULLY! Drivers are asked to use caution and pay attention to all police and flagger instructions, signage, and barricades. Large, slow-moving vehicles may be exiting and entering the highways at various times.
 
Dulles International Airport Access Highway (DIAAH) East
 
When: Wednesday, July 18, 8 p.m. to 5 a.m.
What:  Three left lanes closed
Where: From mile marker 0.0 to 0.3 (from 1/10 mile before the Aviation Drive overpass to 2/10 mile past the Aviation Drive overpass). Single lane closure will begin at 8 p.m., transitioning to a triple lane closure at 9 p.m. Ramp to the eastbound Dulles Access Highway at mile marker 0.3 will be closed; authorized traffic to use ramp at mile marker 0.7.
Why:   Sign installation
 
{"gmap":{"map":{"options":{"center":"(38.9590473482531, -77.44393347145501)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95693198001304, -77.44450467065303)"},"marker1":{"position":"(38.95850043622085, -77.4446441455218)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway East
 
When: Wednesday, July 18, 8 p.m. to 5 a.m.
What:  Two left lanes closed
Where: From mile marker 10.5 to 12.0 (from 5/10 mile before the Old Ox Road overpass to 4/10 mile before the Main Toll Booth)
Why:   Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.98598017881727, -77.44817939918369)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.993149620014556, -77.4622670142436)"},"marker1":{"position":"(38.97704567205056, -77.44820115899535)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.