Skip to main content
Silver Line on Track

Daily Traffic Reminder for Monday, April 3

April 3, 2017
 
CONTACT:      Marcia McAllister
                      T: 703-572-0506
                      C: 571-730-9117
                      marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles International Airport Access Highway and Dulles Greenway - Monday, April 3
 
Nighttime construction activities will take place Monday, April 3, causing lane closures and detours on the Dulles International Airport Access Highway and Dulles Greenway.
 
On or about April 3 at 7 p.m. to April 4 at 3 a.m., the eastern portion Copilot Way at Dulles International Airport will be closed. With the exception of Garage Shuttle Buses, access to parking Garage 1 and Garage 2 from Saarinen Circle will be closed while work is underway. Garage shuttle buses will be diverted around the work area as needed for safety. All other vehicles will use Aviation Drive and Cargo Drive as follows:
 
Access to Garage 1:               Use main entrance located on Aviation Drive
Access to Garage 2:               Take Aviation Dr. to Cargo Dr. to the Copilot Way or Cargo Drive entrances.
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
See below for more detailed information.  All work is weather permitting.
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Monday, April 3 - Tuesday, April 4, 10 p.m. to 5 a.m.
What:    Full closure begins at 10 p.m.; follow detour. Road reopens at 5 a.m.
Where:  From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.95977002624271, -77.4445810566101)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95550432231543, -77.44640350341797)"},"marker1":{"position":"(38.961611217568795, -77.4429702758789)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Monday, April 3 - Tuesday, April 4, 6 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 1.8 to 2.3 (from 6/10 mile past the Route 28 overpass to 2/10 mile before the Centreville Road bridge)
Why:     Overhead sign installation
 
{"gmap":{"map":{"options":{"center":"(38.9577594286234, -77.40824248887634)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.96154447889797, -77.41831540930434)"},"marker1":{"position":"(38.95827418257734, -77.40878820419312)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Monday, April 3 - Tuesday, April 4, 6 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 3.3 to 3.9 (from 1/10 mile before the Monroe/Van Buren Street overpass to 3/10 mile before the Fairfax County Parkway overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.953562852282666, -77.38036897279358)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95358538146066, -77.39157915115356)"},"marker1":{"position":"(38.95260086068056, -77.38117218017578)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Monday, April 3 - Tuesday, April 4, 10 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 3.9 to 3.3 (from 3/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Monroe/Van Buren Street overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.95426368947327, -77.38684918977356)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.952550799936525, -77.38121509552002)"},"marker1":{"position":"(38.95363544147393, -77.39168643951416)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Monday, April 3 - Tuesday, April 4, 10 p.m. to 5 a.m.
What:    Full closure
Where:  From mile marker 0.3 to Saarinen Circle (from 2/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1), traffic will be diverted around work area.
Why:    Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.96005362674878, -77.44271448321102)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95553769475787, -77.4464464187622)"},"marker1":{"position":"(38.96171132723927, -77.44284152984619)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Copilot Way
 
When:   Monday, April 3 - Tuesday, April 4, 7 p.m. to 3 a.m.
What:    Full closure
Where:  From Saarinen Circle to the Garage 1 bus lane (buses will have full access to Garage 1 and the west end of Copilot Way).
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.956466322946845, -77.44640471481375)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95550432333387, -77.44653224945068)"},"marker1":{"position":"(38.95635531570744, -77.4446439743042)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway East
 
When:   Monday, April 3 - Tuesday, April 4, 8 p.m. to 5 a.m.
What:    Two right lanes closed
Where:  From mile marker 10.0 to 12.0 (from the 5/10 mile before the Broad Run bridge to 4/10 mile before the mainline toll plaza)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.97738761814092, -77.44924810029602)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(39.00080961605717, -77.48429775238037)"},"marker1":{"position":"(38.97892791085827, -77.45121002197266)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.