Skip to main content
Silver Line on Track

Daily Traffic Reminder for Monday, April 4, 2016

 

 

 

 

 

April 4, 2016

 
CONTACT:   Marcia McAllister
                     T: 703-572-0506
                     C: 571-730-9117
                     marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT 
Lane Closures and Detour Tonight on the Dulles Toll Road (DTR) and Dulles International Airport Access Highway (DIAAH) - Monday, April 4
 
Nighttime construction activities will take place on Monday, April 4, causing lane closures and a detour on the Dulles Toll Road (DTR) and Dulles International Airport Access Highway (DIAAH).

Please stay alert, obey all signage and drive carefully. All work is weather dependent and subject to change.
 
Dulles Toll Road (DTR) East

When:   Monday, April 4 - Tuesday, April 5, 9 p.m. to 5 a.m  
What:    Left lane closed
Where:  From mile marker 3.3 to 5.1 (from 1/10 mile before the Monroe Street overpass to 1/10 mile before the Reston Parkway overpass)
Why:     Jack and bore operations
{"gmap":{"map":{"options":{"center":"(38.953218167168885, -77.37308141090011)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.9530180321724, -77.36383438110352)"},"marker1":{"position":"(38.952667608284266, -77.38348960876465)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

Dulles International Airport Access Highway (DIAAH) East

When:   Monday, April 4 - Tuesday, April 5, 9 p.m. to 5 a.m  
What:    Eastbound lane reductions begin at 9 p.m.  Eastbound full lane closures begin at 10 p.m.  Road reopens at 5 a.m. Follow detour.
Where:  From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass)
Why:     Installation of a concrete span across the eastbound DIAAH.
{"gmap":{"map":{"options":{"center":"(38.96173885493322, -77.43820812799072)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.95246736528457, -77.44889259338379)"},"marker1":{"position":"(38.962211868378226, -77.44305610656738)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
When:   Monday, April 4 - Tuesday, April 5, 6 p.m. to 5 a.m    
What:    Right lane closed
Where:  From mile marker 3.3 to 5.1 (from 1/10 mile before the Monroe Street overpass to 1/10 mile before the Reston Parkway overpass) 
Why:     Construction entrance acceleration/deceleration lane
 

<><><><><> 

A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.