Skip to main content
Silver Line on Track

Daily Traffic Reminder for Monday, August 29, 2016

 

 

August 29, 2016
 
CONTACT:  Marcia McAllister
                    T: 703-572-0506
                    C: 571-730-9117
                    marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detour Tonight on the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH), Dulles Greenway and Airport Roads - Monday, August 29
 

Nighttime construction activities will take place Monday, August 29, causing lane closures and a detour on the Dulles Toll Road, Dulles International Airport Access Highway, Dulles Greenway, Autopilot Drive and Rudder Road.

 

On or about Monday, August 29 at 9 a.m., and continuing until Tuesday, August 30 at 4 a.m., the northbound and southbound lanes of Autopilot Drive from Rudder Road to the Hertz car rental facility at Dulles International Airport will be closed for the construction of the aerial guideway.  Follow detour signs around the work area.  All car rental facilities, including Hertz, will be accessible. 

 

All work is weather dependent.
 
<><><> 
 
Dulles Toll Road (DTR) West
 
When:   Monday, August 29 - Tuesday, August 30, 8 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 4.0 to 3.3 (from 2/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Monroe Street overpass)
Why:     Duct bank work
{"gmap":{"map":{"options":{"center":"(38.95659559189648, -77.39622082807159)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.95303471898101, -77.3818051815033)"},"marker1":{"position":"(38.9580822982286, -77.40678191184998)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 

Dulles International Airport Access Highway (DIAAH) East

 

When:   Monday, August 29 - Tuesday, August 30, 6 p.m. to 5 a.m.

What:    Right lane closure; slip ramp will remain open.

Where:  From mile marker 1.7 to 2.1 (between the Route 28 and Centreville Road overpasses). 

Why:     Directional drilling operation

{"gmap":{"map":{"options":{"center":"(38.95524818715453, -77.4167719135437)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.956922638279146, -77.40419626235962)"},"marker1":{"position":"(38.96249550678728, -77.42745637893677)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 

Dulles International Airport Access Highway (DIAAH) West

When:   Monday, August 29 - Tuesday, August 30, 7 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 4.0 to 3.3 (from 2/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Monroe Street overpass)
Why:     Road work
{"gmap":{"map":{"options":{"center":"(38.95375057720916, -77.39410724736786)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95776527077483, -77.40661025047302)"},"marker1":{"position":"(38.9528428204449, -77.382293343544)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Monday, August 29 - Tuesday, August 30, 10 p.m. to 5 a.m.

What:    Two left lanes closed; right lane diverted around work area. Traffic on ramp from Aviation Drive must stop.

Where:  From mile marker 0.4 to Saarinen Circle (from Rudder Road overpass to Saarinen Circle near Garage 1)

Why:     Installation of a concrete span across the westbound DIAAH.  

{"gmap":{"map":{"options":{"center":"(38.95745074260709, -77.44679119683838)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.961661272930904, -77.44131803512573)"},"marker1":{"position":"(38.955521009557074, -77.44934320449829)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

Dulles Greenway East

When:   Monday, August 29 - Tuesday, August 30, 10 p.m. to 5 a.m.

What:    Two right lanes closed

Where:  From mile marker 11.0 to 12.0 (from the Old Ox Road overpass to 4/10 mile before the mainline toll booth)

Why:     Installation of a concrete span across the eastbound Dulles Greenway

{"gmap":{"map":{"options":{"center":"(38.98630706957521, -77.45666172601318)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.990770223389475, -77.45841979980469)"},"marker1":{"position":"(38.97786033746805, -77.44936466217041)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 

Autopilot Drive North and South

 
When:   Monday, August 29 - Tuesday, August 30, 9 p.m to 4 a.m.
What:    Full closure of all northbound and southbound lanes
Where:  From Rudder Road to 700 feet north of Rudder Road (near the Hertz car rental facility)
Why:     Aerial guideway construction
{"gmap":{"map":{"options":{"center":"(38.96524673826679, -77.44989183045959)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.96399710297521, -77.4495792388916)"},"marker1":{"position":"(38.965757266875464, -77.44956851005554)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 

Rudder Road West

 

When:   Monday, August 29, 6 p.m. to 10 p.m.

What:    Right lane and ramp to Green Lot closed

Where:  From the ramp from the westbound DIAAH to Ariane Way/Blue Lot access road, including the ramp to the Green Lot. Traffic will be directed to use next entrance to Economy Parking.

Why:     Duct bank work

{"gmap":{"map":{"options":{"center":"(38.96309030736799, -77.44899060823059)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.96332973082083, -77.441725730896)"},"marker1":{"position":"(38.96411389245588, -77.446950674057)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 
                                                                    <><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.