Skip to main content
Silver Line on Track

Daily Traffic Reminder for Monday, September 12, 2016

 

 

September 12, 2016
 
CONTACT:  Marcia McAllister
                    T: 703-572-0506
                    C: 571-730-9117
                    marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detour Tonight on the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH) and Rudder Road - Monday, September 12
 

Nighttime construction activities will take place Monday, September 12, causing lane closures and a detour on the Dulles Toll Road, Dulles International Airport Access Highway and Rudder Road.

 

All work is weather dependent.
 
<><><> 
 

Dulles Toll Road (DTR) East

 

When:   Monday, September 12 - Tuesday, September 13, 9 p.m. to 5 a.m.

What:    Left lane closed

Where:  From mile marker 1.7 to 2.1 (between the Route 28 overpass and the Centreville Road overpass) 

Why:     Directional drilling operation

{"gmap":{"map":{"options":{"center":"(38.95506463777622, -77.4060752639923)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.96261229874329, -77.42752075195312)"},"marker1":{"position":"(38.956905952386, -77.40415334701538)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

Dulles Toll Road (DTR) West
 
When:   Monday, September 12 - Tuesday, September 13, 8 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 4.0 to 3.3 (from 2/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Monroe Street overpass)
Why:     Duct bank work
{"gmap":{"map":{"options":{"center":"(38.95659559189648, -77.39622082807159)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.95303471898101, -77.3818051815033)"},"marker1":{"position":"(38.9580822982286, -77.40678191184998)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 

Dulles International Airport Access Highway (DIAAH) East

 

When:   Monday, September 12 - Tuesday, September 13, 6 p.m. to 5 a.m.

What:    Right lane closure; slip ramp will remain open.

Where:  From mile marker 1.4 to 2.1 (between the Route 28 and Centreville Road overpasses). 

Why:     Directional drilling operation

{"gmap":{"map":{"options":{"center":"(38.95513138305927, -77.40771677590942)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.962345345418036, -77.42734909057617)"},"marker1":{"position":"(38.95665566351706, -77.40419626235962)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 

When:   Monday, September 12 - Tuesday, September 13, 6 p.m. to 5 a.m.

What:    Left lane closure

Where:  From mile marker 3.2 to 3.9 (from 2/10 mile before the Monroe/Van Buren Street overpass to 3/10 mile before the Fairfax County Parkway overpass)

Why:     Construction entrance acceleration/deceleration lane

{"gmap":{"map":{"options":{"center":"(38.953971674819044, -77.37931754685974)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.954052606876054, -77.39233016967773)"},"marker1":{"position":"(38.95276772957196, -77.37958431243896)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 

Dulles International Airport Access Highway (DIAAH) West

When:   Monday, September 12 - Tuesday, September 13, 7 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 4.0 to 3.3 (from 2/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Monroe Street overpass)
Why:     Road work
{"gmap":{"map":{"options":{"center":"(38.95375057720916, -77.39410724736786)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95776527077483, -77.40661025047302)"},"marker1":{"position":"(38.9528428204449, -77.382293343544)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 

Rudder Road West

 

When:   Monday, September 12 - Tuesday, September 13, 8 p.m. to 4 a.m.

What:    Right lane and ramp to Green Lot closed

Where:  From the ramp from the westbound DIAAH to Ariane Way/Blue Lot access road, including the ramp to the Green Lot. Traffic will be directed to use next entrance to Economy Parking.

Why:     Duct bank work

{"gmap":{"map":{"options":{"center":"(38.96309030736799, -77.44899060823059)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.96332973082083, -77.441725730896)"},"marker1":{"position":"(38.96411389245588, -77.446950674057)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 
                                                                    <><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.