Skip to main content
Silver Line on Track

Daily Traffic Reminder for Monday, September 21, 2015

September 21, 2015

CONTACT: Marcia McAllister

                  T: 703-572-0506

                  C: 571-730-9117

                  marcia.mcallister@dullesmetro.com

Nighttime Lane Closures on the Dulles Toll Road, Dulles International Airport Access Highway and Airport Roads – Monday, September 21, 2015

Construction activities will take place overnight on Monday, September 21 causing lane closures on the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH) and on Dulles Airport roads.

All work is weather dependent and subject to change.

Dulles Toll Road (DTR) East

When:   Monday, September 21 - Wednesday, September 23, 8 p.m. to 5 a.m.

What:    Alternating right and left lane closures of varying lengths

Where:  From mile marker 0.6 to 5.7 (from the overpass of the ramp to the northbound Dulles

Greenway to 5/10 mile after the Reston Parkway overpass)

Why:     Jack and bore operations

Dulles International Airport Access Highway (DIAAH) West

When:   Monday, September 21 - Saturday, September 26, 7 p.m. to 5 a.m.

What:    Alternating right and left lane closures of varying lengths

Where:  From mile marker 5.7 to 3.2 (from 5/10 mile before the Reston Parkway overpass to 2/10 mile after the Monroe Street overpass)

Why:     Construction entrance acceleration/deceleration lane

 

When:   Monday, September 21  Saturday, September 26, 6 p.m. to 5 a.m.

What:    Alternating right and left lane closures

Where:  From mile marker 0.3 to 200 feet past Copilot Way (from 2/10 mile after the Rudder Road overpass, continuing along Saarinen Circle past Daily Garage 1), including ramps in the vicinity of Daily Garage 1

Why:     Road widening

Dulles International Airport Access Highway (DIAAH)/Saarinen Circle West

When:   Monday, September 21 - Saturday, September 26, 10 p.m. to 5 a.m.

What:    Right three lanes closed, intermittent stoppages of up to 20 minutes in remaining single lane

Where:  As the westbound DIAAH transitions to Saarinen Circle and continuing in front of Daily Garage 1, traffic will be reduced to a single left lane.  Stoppages of up to 20 minutes will occur after 1 a.m.  Police will be on site for safety. 

Why:     Overhead sign installation and removal

Rudder Road

When:   Monday, September 21, 6 p.m. to 5 a.m.

What:    Right lane closed

Where:  Westbound Rudder Road from the ramp from the westbound DIAAH to the intersection with Ariane Way

Why:     Utility work

<><><><><> 

A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues:

844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.