Skip to main content
Silver Line on Track

Daily Traffic Reminder for Saturday, March 25

March 25, 2017
 
CONTACT:    Marcia McAllister
                      T: 703-572-0506
                      C: 571-730-9117
                      marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles Toll Road, Dulles International Airport Access Highway and Dulles Greenway -- Saturday, March 25
 
Nighttime construction activities will take place Saturday, March 25, causing lane closures on the Dulles Toll Road, Dulles International Airport Access Highway and Dulles Greenway.
On or about Saturday, March 25 at 9 p.m. and continuing until Sunday, March 26 at 5 a.m., the eastbound Dulles International Airport Access Highway (DIAAH) will be diverted to the left lane of the eastbound Dulles Toll Road at mile marker 2.7.  Follow detour signs.  Traffic will return to the eastbound DIAAH at mile marker 4.9. From mile marker 2.7 to mile marker 4.9, traffic on the eastbound Dulles Toll Road will be restricted to the two right lanes. 
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
See below for more detailed information.  All work is weather permitting.
 
Dulles Toll Road East
 
When:   Saturday, March 25 - Sunday, March 26, 9 p.m. to 5 a.m.
What:    Two left lanes closed
Where:  From mile marker 2.7 to 4.9 (from 2/10 mile past the Centreville Road bridge to 3/10 mile before the Reston Parkway overpass)
Why:     Herndon and Reston Town Center Station construction
 
{"gmap":{"map":{"options":{"center":"(38.95208606551449, -77.35919025041198)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.9554042059122, -77.3990249633789)"},"marker1":{"position":"(38.953418514494416, -77.3640489578247)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Saturday, March 25 - Sunday, March 26, 9 p.m. to 5 a.m.
What:    Road closed
Where:  From mile marker 2.7 to 4.9 (from 2/10 mile past the Centreville Road bridge to 3/10 mile before the Reston Parkway overpass).  Follow detour to eastbound Dulles Toll Road, returning to the eastbound Dulles Access Highway at mile marker 4.9.
Why:     Herndon and Reston Town Center Station construction
 
{"gmap":{"map":{"options":{"center":"(38.95310396703353, -77.36007001496887)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95498704846607, -77.39932537078857)"},"marker1":{"position":"(38.9530180321724, -77.36419916152954)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway East
 
When:   Saturday, March 25 - Sunday, March 26, 8 p.m. to 5 a.m.
What:    Two right lanes closed
Where:  From mile marker 10.0 to 12.0 (from the 5/10 mile before the Broad Run bridge to 4/10 mile before the mainline toll plaza)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.98178275440125, -77.45377566911316)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(39.00104307544135, -77.48476982116699)"},"marker1":{"position":"(38.983047925979776, -77.4537205696106)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.