Skip to main content
Silver Line on Track

Daily Traffic Reminder for Sunday, April 10, 2016

 

 

 

 

 

April 10, 2016

 
CONTACT:    Marcia McAllister
                     T: 703-572-0506
                     C: 571-730-9117
                     marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT 
Lane Closures and Detour Tonight on the Dulles Toll Road (DTR) and Dulles International Airport Access Highway (DIAAH) - Sunday, April 10
 
Nighttime construction activities will take place on Sunday, April 10, causing lane closures and a detour on the Dulles Toll Road (DTR) and Dulles International Airport Access Highway (DIAAH).

Please stay alert, obey all signage and drive carefully. All work is weather dependent and subject to change.
 
Dulles Toll Road (DTR) East

When:   Sunday, April 10 - Monday, April 11, 9 p.m. to 5 a.m  
What:    Left lane closed
Where:  From mile marker 3.3 to 5.3 (from 1/10 mile before the Monroe Street overpass to 1/10 mile before the Reston Parkway overpass)
Why:     Jack and bore operations
{"gmap":{"map":{"options":{"center":"(38.953218167168885, -77.37308141090011)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.9530180321724, -77.36383438110352)"},"marker1":{"position":"(38.952667608284266, -77.38348960876465)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

Dulles International Airport Access Highway (DIAAH) East

When:   Sunday, April 10 - Monday, April 11, 7 p.m. to 5 a.m  
What:    Eastbound lane reductions begin at 7 p.m.  Eastbound full lane closures begin at 10 p.m. 15 minute closures of ramp from Eastbound DIAAH to Aviation Drive may occur. Follow signage and police instructions to exit airport. Eastbound DIAAH reopens at 5 a.m. 
Where:  From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass)
Why:     Installation of a concrete span across the eastbound DIAAH. movement of large forms across Aviation Drive
{"gmap":{"map":{"options":{"center":"(38.96173885493322, -77.43820812799072)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.95246736528457, -77.44889259338379)"},"marker1":{"position":"(38.962211868378226, -77.44305610656738)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
When:   Sunday, April 10 - Monday, April 11, 6 p.m. to 5 a.m    
What:    Right lane closed
Where:  From mile marker 3.3 to 5.3 (from 1/10 mile before the Monroe Street overpass to 1/10 mile after the Reston Parkway overpass) 
Why:     Construction entrance acceleration/deceleration lane
{"gmap":{"map":{"options":{"center":"(38.95536499105576, -77.3732772121582)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.95273435582513, -77.38383293151855)"},"marker1":{"position":"(38.95313483975009, -77.36383438110352)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 

<><><><><> 

A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.