Skip to main content
Silver Line on Track

Daily Traffic Reminder for Thursday, Dec. 8

December 8, 2016
 
CONTACT: Marcia McAllister
                      T: 703-572-0506
                      C: 571-730-9117
                      marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles Toll Road, Dulles International Airport Access Highway, Dulles Greenway and Airport Roads - Thursday, Dec. 8
 
Nighttime construction activities will take place on Thursday, Dec. 8, causing lane and road closures on the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH), Dulles Greenway and airport roads.
 
On or about Thursday, Dec. 8, through Friday, Dec. 9, Copilot Way will be closed at night from 7 p.m. to 3 a.m.  Garage Shuttle Buses will be diverted around the work area as needed.   All other vehicles will access Garage 1 via the main entrance located on Aviation Drive; and access to Garage 2 will follow Aviation Drive to Cargo Drive to the entrances located on Copilot Way and Cargo Drive.  
 
Drivers are asked to use caution remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
 
All work is weather dependent.
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Thursday, Dec. 8 - Friday, Dec. 9, 10 p.m. to 4 a.m.
What:    Full closure begins at 10 p.m.; follow detour. Road reopens at 4 a.m.
Where:  From Saarinen Circle to mile marker 0.3 (near the Rudder Road overpass)
Why:     Installation of a concrete span across the eastbound DIAAH
{"gmap":{"map":{"options":{"center":"(38.95896913112232, -77.44537499047851)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.96037653358077, -77.44331359863281)"},"marker1":{"position":"(38.95456988856441, -77.44391441345215)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Thursday, Dec. 8 - Friday, Dec. 9, 6 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 4.1 to 2.6 (from 1/10 mile past the Fairfax County Parkway overpass to the Centreville Road bridge)
Why:     Construction entrance acceleration/deceleration lane
{"gmap":{"map":{"options":{"center":"(38.95386321192685, -77.38945629693603)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95620514132528, -77.40211486816406)"},"marker1":{"position":"(38.953234960377735, -77.37550735473633)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Thursday, Dec. 8 - Friday, Dec. 9, 10 p.m. to 4 a.m.
What:    Full closure
Where:  From mile marker 0.3 to Saarinen Circle (from 2/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1), traffic will be diverted around work area.
Why:    Installation of a concrete span across the westbound DIAAH. 
{"gmap":{"map":{"options":{"center":"(38.95953643276766, -77.44490292169189)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.96131089178207, -77.443528175354)"},"marker1":{"position":"(38.95557106820309, -77.44657516479492)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Thursday, Dec. 8 - Friday, Dec. 9, 9 p.m. to 5 a.m.
What:    Two right lanes closed
Where:  From mile marker 0.3 to Saarinen Circle (from 2/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1)
Why:    Aerial guideway construction 
{"gmap":{"map":{"options":{"center":"(38.95920272646741, -77.4441304454956)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.96131089178207, -77.44348526000977)"},"marker1":{"position":"(38.95550432333387, -77.44661808013916)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Cargo Drive North/Aviation Drive East
 
When:   Thursday, Dec. 8 - Friday, Dec. 9, 6 p.m. to 5 a.m.
What:    Two right lanes and turn lane closed, traffic diverted to one southbound lane
Where:  From 300 feet south Aviation Drive to 300 feet east of Autopilot Drive (along the transition from northbound Cargo Drive to eastbound Aviation Drive)
Why:     Duct bank work
{"gmap":{"map":{"options":{"center":"(38.95708365478566, -77.45064284898376)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.95720629735262, -77.45296955108643)"},"marker1":{"position":"(38.95819075466348, -77.4490213394165)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Copilot Way
 
When:   Thursday, Dec. 8 - Friday, Dec. 9, 7 p.m. to 3 a.m.
What:    Full closure
Where:  Copilot Way closed. 
Detour:  Access to Garage 1: Main entrance located on Aviation Drive.  Access to Garage 2: Aviation Drive to Cargo Drive to entrances located on Copilot Way and Cargo Drive. Garage Shuttle Buses will be diverted around the work area as needed.  
Why:     Aerial guideway construction
{"gmap":{"map":{"options":{"center":"(38.956165926912355, -77.45206978417968)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95622182738345, -77.45284080521742)"},"marker1":{"position":"(38.95620514132528, -77.45144605652968)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway East
 
When:   Thursday, Dec. 8 - Friday, Dec. 9, 8 p.m. to 5 a.m.
What:    Two left lanes closed
Where:  From mile marker 10.4 to 12.0 (from the Broad Run bridge to 4/10 mile before the mainline toll plaza)
Why:     Installation of a concrete span across the eastbound Dulles Greenway
{"gmap":{"map":{"options":{"center":"(38.9880291522769, -77.45867874719238)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.99357205820946, -77.46850490570068)"},"marker1":{"position":"(38.98072940445603, -77.45275497698458)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.