Skip to main content
Silver Line on Track

Daily Traffic Reminder for Thursday, Nov. 17

 

 

November 17, 2016
 
CONTACT:     Marcia McAllister
                     T: 703-572-0506
                     C: 571-730-9117
                     marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles Toll Road, Dulles International Airport Access Highway, Dulles Greenway and Airport Roads - Thursday, Nov. 17
 
Night time construction activities will take place on Thursday, Nov. 17, causing lane and road closures on the Dulles Toll Road, Dulles International Airport Access Highway, Dulles Greenway and airport roads.
 
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. 
 
All work is weather permitting.  
 
Dulles Toll Road East
 
When:   Thursday, Nov. 17 - Friday, Nov. 18, 9 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 2.3 to 2.5 (from 2/10 mile before the Centreville Road bridge, continuing to the Centreville Road bridge
Why:     Paving
 
When:   Thursday, Nov. 17 - Friday, Nov. 18, 9 p.m. to 5 a.m.
What:    Right lane closed, ramp to Centreville Road narrows
Where:  From mile marker 2.3 to 2.5 (from 2/10 mile before the Centreville Road bridge, continuing to the end of the ramp to Centreville Road
Why:     Paving
 
Dulles Toll Road West
 
When:   Thursday, Nov. 17 - Friday, Nov. 18, 8 p.m. to 5 a.m.
What:    Left lane closed; slip ramp to the westbound DIAAH at mile marker 1.8 will remain open.
Where:  From mile marker 2.7 to 1.8 (from 1/10 mile before the Centreville Road bridge to 6/10 mile before the Route 28 overpass)
Why:    Jack and bore operations
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Thursday, Nov. 17 - Friday, Nov. 18, 7 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 3.3 to 3.9 (from 1/10 mile before the Monroe Street overpass to 3/10 mile before the Fairfax County Parkway overpass)
Why:     Construction entrance acceleration/deceleration lane
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Thursday, Nov. 17 - Friday, Nov. 18, 7 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 2.7 to 1.8 (from 1/10 mile before the Centreville Road bridge to 6/10 mile before the Route 28 overpass)
Why:    Jack and bore operations
 
Dulles International Airport Access Highway (DIAAH) West/Saarinen Circle
 
When:   Thursday, Nov. 17 - Friday, Nov. 18, 7 p.m. to 3 a.m.
What:    Two right lanes closed
Where:  From mile marker 0.0 to Copilot Way (in the vicinity of Garage 1)
Why:     Construction entrance acceleration/deceleration lane
 
Aviation Drive West/Cargo Drive South
 
When:   Thursday, Nov. 17 - Friday, Nov. 18, 6 p.m. to 5 a.m.
What:    Two right lanes and turn lane closed, traffic diverted to one northbound lane
Where:  From 300 feet west of Autopilot Drive to 300 feet south of Cargo Drive (along the transition from westbound Aviation Drive to southbound Cargo Drive)
Why:     Aerial guideway work
 
Dulles Greenway East
 
When:   Thursday, Nov. 17 - Friday, Nov. 18, 10 p.m. to 4 a.m.
What:    Two left lanes closed
Where:  From mile marker 10.6 to 12.0 (from the Broad Run bridge to 4/10 mile before the mainline toll plaza)
Why:     Installation of a concrete span across the eastbound Dulles Greenway
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.