Skip to main content
Silver Line on Track

Daily Traffic Reminder for Tuesday, Dec.6

December 6, 2016
 
CONTACT:   Marcia McAllister
                      T: 703-572-0506
                      C: 571-730-9117
                      marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles Toll Road, Dulles International Airport Access Highway and Airport Roads - Tuesday, Dec. 6
 
Night time construction activities will take place on Tuesday, Dec. 6, causing lane and road closures on the Dulles Toll Road, Dulles International Airport Access Highway and airport roads.
 
Drivers are asked to use caution remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
 
All work is weather dependent.
 
Dulles Toll Road West
 
When:   Tuesday, Dec. 6 - Wednesday, Dec. 7, 8 p.m. to 5 a.m.
What:    Left lane closed; slip ramp to the westbound DIAAH at mile marker 1.8 will remain open.
Where:  From mile marker 2.7 to 1.8 (from 1/10 mile before the Centreville Road bridge to 6/10 mile before the Route 28 overpass)
Why:    Jack and bore operations
{"gmap":{"map":{"options":{"center":"(38.95830171160783, -77.4097659835968)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95617176919712, -77.40278005599976)"},"marker1":{"position":"(38.96091045406169, -77.41612672805786)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Tuesday, Dec. 6 - Wednesday, Dec. 7, 6 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 3.9 to 3.5 (from 3/10 mile after the Fairfax County Parkway overpass to 1/10 mile before the Monroe Street/Van Buren Street overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.95311202618595, -77.38127019502258)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95273435582513, -77.38606452941895)"},"marker1":{"position":"(38.952584173769814, -77.38078594207764)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Tuesday, Dec. 6 - Wednesday, Dec. 7, 7 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 2.3 to 1.8 (from 2/10 mile past the Centreville Road bridge to 6/10 mile before the Route 28 overpass)
Why:    Jack and bore operations
 
{"gmap":{"map":{"options":{"center":"(38.96097969442091, -77.41104271508789)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.958107326142155, -77.40762948989868)"},"marker1":{"position":"(38.961010563703944, -77.41578340530396)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Tuesday, Dec. 6 - Wednesday, Dec. 7, 10 p.m. to 4 a.m.
What:    Full closure
Where:  From mile marker 0.3 to Saarinen Circle (from 2/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1), traffic will be diverted around work area.
Why:    Installation of a concrete span across the westbound DIAAH. 
 
{"gmap":{"map":{"options":{"center":"(38.9588189622799, -77.44717743493648)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.961644588153575, -77.44133949279791)"},"marker1":{"position":"(38.95455320211726, -77.44395732748677)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Tuesday, Dec. 6 - Wednesday, Dec. 7, 9 p.m. to 5 a.m.
What:    Two right lanes closed
Where:  From mile marker 0.3 to Saarinen Circle (from 2/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1)
Why:    Aerial guideway construction 
 
{"gmap":{"map":{"options":{"center":"(38.959069148611626, -77.44822934902092)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95456988856441, -77.44391441345215)"},"marker1":{"position":"(38.961644588153575, -77.44121074676514)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Cargo Drive North/Aviation Drive East
 
When:   Tuesday, Dec. 6 - Wednesday, Dec. 7, 6 p.m. to 5 a.m.
What:    Two right lanes and turn lane closed, traffic diverted to one southbound lane
Where:  From 300 feet south Aviation Drive to 300 feet east of Autopilot Drive (along the transition from northbound Cargo Drive to eastbound Aviation Drive)
Why:     Duct bank work
 
{"gmap":{"map":{"options":{"center":"(38.95815997904709, -77.44961833681714)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.95827418257734, -77.44462251663208)"},"marker1":{"position":"(38.9580072129072, -77.45257258415222)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.