Skip to main content
Silver Line on Track

Daily Traffic Reminder for Tuesday, March 21

March 21,  2017
 
CONTACT:      Marcia McAllister
                      T: 703-572-0506
                      C: 571-730-9117
                      marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles International Airport Access Highway, Dulles Greenway and Airport Roads -- Tuesday, March 21
 
Nighttime construction activities will take place Tuesday, March 21, causing lane closures and detours on the Dulles International Airport Access Highway, Dulles Greenway and airport roads.
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
See below for more detailed information.  All work is weather permitting.
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Tuesday, March 21 - Wednesday, March 22, 10 p.m. to 5 a.m.
What:    Full closure begins at 10 p.m.; follow detour. Road reopens at 5 a.m.
Where:  From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.95888570402627, -77.44089033700561)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95553769577634, -77.44614601135254)"},"marker1":{"position":"(38.9616445881536, -77.44292736053467)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Tuesday, March 21 - Wednesday, March 22, 6 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 3.3 to 3.9 (from 1/10 mile before the Monroe/Van Buren Street overpass to 3/10 mile before the Fairfax County Parkway overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.952403118374555, -77.37936046220398)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95360206813569, -77.3917293548584)"},"marker1":{"position":"(38.95263423449029, -77.38117218017578)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Tuesday, March 21 - Wednesday, March 22, 7 p.m. to 5 a.m.
What:    Left lane closed
Where:  From mile marker 3.9 to 3.3 (from 3/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Monroe/Van Buren Street overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.95403842113178, -77.3882439384613)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95256748685513, -77.38271713256836)"},"marker1":{"position":"(38.95360206813569, -77.39177227020264)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Tuesday, March 21 - Wednesday, March 22, 10 p.m. to 5 a.m.
What:    Full closure
Where:  From mile marker 0.3 to Saarinen Circle (from 2/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1), traffic will be diverted around work area.
Why:    Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.96087958473277, -77.44079377748108)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95553769577634, -77.44627475738525)"},"marker1":{"position":"(38.960927139011915, -77.44380712509155)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Aviation Drive West and East
 
When:   Tuesday, March 21 - Wednesday, March 22, 6 p.m. to 5 a.m.
What:    Left lanes closed
Where:  Between the ramps to and from the Dulles International Airport Access Highway
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.95968660009006, -77.44848635293579)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95809898384475, -77.45243310928345)"},"marker1":{"position":"(38.958174069068924, -77.44457960128784)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway East
 
When:   Tuesday, March 21 - Wednesday, March 22, 8 p.m. to 5 a.m.
What:    Two left lanes closed
Where:  From mile marker 10.0 to 12.0 (from the 5/10 mile before the Broad Run bridge to 4/10 mile before the mainline toll plaza)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.978913730094774, -77.44881894685363)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(39.000909671336494, -77.48434066772461)"},"marker1":{"position":"(38.98124649137416, -77.45314121246338)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.