Skip to main content
Silver Line on Track

Daily Traffic Reminder for Tuesday, September 20, 2016

 

 

September 20, 2016
 
CONTACT:  Marcia McAllister
                    T: 703-572-0506
                    C: 571-730-9117
                    marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detour Tonight on the Dulles International Airport Access Highway (DIAAH), Dulles Greenway and Airport Roads - Tuesday, September 20
 

Nighttime construction activities will take place Tuesday, September 20, causing lane closures and a detour on the Dulles International Airport Access Highway, Dulles Greenway, Autopilot Drive and Rudder Road.

 

All work is weather dependent.
 
<><><> 
 

Dulles International Airport Access Highway (DIAAH) East

 

When:   Tuesday, September 20 - Wednesday, September 21, 10 p.m. to 5 a.m.

What:    Full closure begins at 10 p.m.; follow detour. Road reopens at 5 a.m.

Where:  From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass)

Why:     Installation of a concrete span across the eastbound DIAAH

{"gmap":{"map":{"options":{"center":"(38.96278998683246, -77.44112637139892)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.95555438199166, -77.44940757751465)"},"marker1":{"position":"(38.96229529155759, -77.4390435218811)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 

When:   Tuesday, September 20 - Wednesday, September 21, 6 p.m. to 5 a.m.

What:    Right lane closure; slip ramp will remain open.

Where:  From mile marker 1.7 to 2.1 (between the Route 28 and Centreville Road overpasses).

Why:     Directional drilling operation

{"gmap":{"map":{"options":{"center":"(38.957425713952354, -77.38899495698547)","zoom":13},"size":"full"}},"marker":{"marker0":{"position":"(38.96252887593719, -77.42739200592041)"},"marker1":{"position":"(38.95667234946919, -77.40443229675293)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 

When:   Tuesday, September 20 - Wednesday, September 21, 6 p.m. to 5 a.m.

What:    Left lane closure

Where:  From mile marker 3.2 to 3.9 (from 2/10 mile before the Monroe/Van Buren Street overpass to 3/10 mile before the Fairfax County Parkway overpass)

Why:     Construction entrance acceleration/deceleration lane

{"gmap":{"map":{"options":{"center":"(38.965409406406735, -77.3971596012268)","zoom":14},"size":"full"}},"marker":{"marker0":{"position":"(38.959542274774726, -77.41138458251953)"},"marker1":{"position":"(38.953602068135716, -77.38760948181152)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 

Dulles International Airport Access Highway (DIAAH) West

When:   Tuesday, September 20 - Wednesday, September 21, 7 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 4.0 to 3.3 (from 2/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Monroe Street overpass)
Why:     Road work
{"gmap":{"map":{"options":{"center":"(38.95375057720916, -77.39410724736786)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95776527077483, -77.40661025047302)"},"marker1":{"position":"(38.9528428204449, -77.382293343544)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 

Dulles Greenway East

 

When:   Tuesday, September 20 - Wednesday, September 21, 8 p.m. to 5 a.m.

What:    Two right lanes closed

Where:  From mile marker 10.6 to 12.0 (from the Broad Run bridge to 4/10 mile before the mainline toll plaza)

Why:     Installation of a concrete span across the eastbound Dulles Greenway

{"gmap":{"map":{"options":{"center":"(38.980189793050194, -77.45116856195068)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.993538703685395, -77.46704578399658)"},"marker1":{"position":"(38.978427487835695, -77.45039463043213)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 

Rudder Road West

When:   Tuesday, September 20 - Wednesday, September 21, 8 p.m. to 4 a.m.

What:    Right lane and ramp to Green Lot closed

Where:  From the ramp from the westbound DIAAH to Ariane Way/Blue Lot access road, including the ramp to the Green Lot. Traffic will be directed to use next entrance to Economy Parking.

Why:     Duct bank work

{"gmap":{"map":{"options":{"center":"(38.96309030736799, -77.44899060823059)","zoom":17},"size":"full"}},"marker":{"marker0":{"position":"(38.96332973082083, -77.441725730896)"},"marker1":{"position":"(38.96411389245588, -77.446950674057)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 

Rudder Road West/Autopilot Drive North

 

When:   Tuesday, September 20 - Wednesday, September 21, 9 p.m. to 5 a.m.

What:    Ramp narrows (right side)

Where:  Along the turn lane/ramp from westbound Rudder Road to northbound Autopilot Drive. Traffic will be flagged as needed for safety.

Why:     Curb and gutter work

{"gmap":{"map":{"options":{"center":"(38.96422901116642, -77.44878139592743)","zoom":18},"size":"full"}},"marker":{"marker0":{"position":"(38.96401795825375, -77.44879066944122)"},"marker1":{"position":"(38.96444757562551, -77.44955778121948)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}

 
                                                                    <><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.