Skip to main content
Silver Line on Track

Daily Traffic Reminder for Wednesday, March 8

March 8, 2017
 
CONTACT:    Marcia McAllister
                      T: 703-572-0506
                      C: 571-730-9117
                      marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Tonight on the Dulles International Airport Access Highway, Dulles Greenway and Airport Roads -- Wednesday, March 8
 
Nighttime construction activities will take place Wednesday, March 8, causing lane closures and detours on the Dulles International Airport Access Highway, Dulles Greenway and airport roads.
Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions.
See below for more detailed information.  All work is weather permitting.
 
Dulles International Airport Access Highway (DIAAH) East
 
When:   Wednesday, Mar. 8 - Thursday, Mar. 9, 10 p.m. to 5 a.m.
What:    Full closure begins at 10 p.m.; follow detour. Road reopens at 5 a.m.
Where:  From Saarinen Circle to mile marker 0.3 (near the Rudder Road overpass)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.959503062208334, -77.43659880258178)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95557106820309, -77.44636058807373)"},"marker1":{"position":"(38.96177806626213, -77.44288444388076)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Wednesday, Mar. 8 - Thursday, Mar. 9, 6 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 2.5 to 3.5 (from the Centreville Road bridge to 1/10 mile after the Monroe/Van Buren Street overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.95316237077589, -77.39209559060669)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95723966848437, -77.40580558645888)"},"marker1":{"position":"(38.95263423449029, -77.38546371459961)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
When:   Wednesday, Mar. 8 - Thursday, Mar. 9, 6 p.m. to 5 a.m.
What:    Right lane closed
Where:  From mile marker 4.5 to 5.3 (from 3/10 mile past the Fairfax County Parkway overpass to 1/10 mile past the Reston Parkway overpass)
Why:     Construction entrance acceleration/deceleration lane
 
{"gmap":{"map":{"options":{"center":"(38.95134348878966, -77.35549953080749)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95305140578567, -77.3651647567749)"},"marker1":{"position":"(38.9516830747551, -77.35396385192871)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Wednesday, Mar. 8 - Thursday, Mar. 9, 7 p.m. to 5 a.m.
What:    Two right lanes closed
Where:  From mile marker 2.3 to 1.4 (from 2/10 mile past the Centreville Road bridge to 2/10 mile before the Route 28 overpass). Single right lane closed from 7 p.m. to 10 p.m., transitioning to two right lanes closed from 10 p.m. to 5 a.m.
Why:     Overhead sign installation
 
{"gmap":{"map":{"options":{"center":"(38.964541743324645, -77.42565520644689)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.95814069786802, -77.40833759307861)"},"marker1":{"position":"(38.962345345418036, -77.42541790008545)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
 
Aviation Drive West/Cargo Drive South
 
When:   Wednesday, Mar. 8 - Thursday, Mar. 9, 6 p.m. to 5 a.m.
What:    Two right lanes and turn lane closed
Where:  From 300 feet west of Autopilot Drive to 300 feet south of Cargo Drive (along the transition from westbound Aviation Drive to southbound Cargo Drive)
Why:     Duct bank work
{"gmap":{"map":{"options":{"center":"(38.95674993693397, -77.44926974132227)","zoom":16},"size":"full"}},"marker":{"marker0":{"position":"(38.95797384137312, -77.45269060134888)"},"marker1":{"position":"(38.955287401947494, -77.45299100875854)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
Dulles Greenway East
 
When:   Wednesday, Mar. 8 - Thursday, Mar. 9, 8 p.m. to 5 a.m.
What:    Two left lanes closed
Where:  From mile marker 10.0 to 12.0 (from the 5/10 mile before the Broad Run bridge to 4/10 mile before the mainline toll plaza)
Why:     Aerial guideway construction
 
{"gmap":{"map":{"options":{"center":"(38.99635126653902, -77.4717035541687)","zoom":15},"size":"full"}},"marker":{"marker0":{"position":"(38.98017895294185, -77.45249748360948)"},"marker1":{"position":"(39.000642862372096, -77.48378276824951)"}},"circle":{},"polygon":{},"polyline":{},"rectangle":{}}
 
<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.