Important Lane and Ramp Closures for the
Week of Feb. 11 - Feb. 17
 
Dulles Corridor Metrorail Project crews are continuing construction activities for the Metrorail Silver Line, Phase 2.  Lane, shoulder, road, and ramp closures will occur at locations along the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH), Dulles Greenway, Sunrise Valley Drive, Moran Road, Old Ox Road, and Herndon Parkway during the week of Feb. 11 - Feb. 17. In addition, there will be westbound shoulder closures along the Dulles Connector Road and the DIAAH along the Phase 1 alignment.  Highlights of significant detour activities include: 
 
Eastbound DIAAH and DTR Near Herndon StationHeavy construction work that requires the use of a large crane will be taking place during the week at night near the Herndon Metrorail Station. The crane will be positioned on the eastbound DIAAH adjacent to the station and the area will be closed to traffic. Eastbound DIAAH drivers will be detoured onto the eastbound DTR, then returned to the DIAAH beyond the location of the construction activity. The eastbound DTR will be reduced to two lanes in order to accommodate entering vehicles.
 
Eastbound and Westbound DIAAH Near Dulles Station: During the weekend of Feb. 16-17, overhead work on the Aerial guideway at Dulles Airport will necessitate nighttime traffic detours between the Rudder Road overpass and Saarinen Circle.
 
Eastbound Greenway near Ashburn StationThe tower crane currently located at the Ashburn Metrorail Station will be dismantled and moved at night during the weekend of Feb. 16-18.  The activity will require the closure of the two left lanes of the eastbound Greenway in that area for reasons of safety.
 
See below for more specific dates, times and details and remember that all work is weather permitting.
 
PLEASE USE CAUTION and remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
 
<><><> 
 
Dulles Toll Road East
 
When:   Monday, Feb. 12 - Friday, Feb. 16, 10 a.m. to 3:30 p.m. and 9 p.m. to 5 a.m.
             Saturday, Feb. 17, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 1.3 to 5.2 (from 1/10 mile past the Route 28 overpass to the Reston Parkway overpass)
Why:     Civil work
 
Dulles Toll Road West
 
When:   Monday, Feb. 12 - Friday, Feb. 16, 9:30 a.m. to 3 p.m. and 8 p.m. to 5 a.m.
             Saturday, Feb. 17, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 5.7 to 1.5 (from approximately 2/10 mile after the Wiehle Avenue overpass to 3/10 mile before the Route 28 overpass)
Why:     Civil work
 
Dulles International Airport Access Highway  and Dulles Toll Road East
 
When:   Monday, Feb. 12 - Sunday, Feb. 18, 9:30 p.m. to 5 a.m.
What:    Full closure of a section of the eastbound DIAAH
Where:  From milemarker 2.7 to 4.0  (Centreville Road and Fairfax County Parkway overpasses) Detour:  Eastbound DIAAH traffic will be detoured onto the left lane of the eastbound Dulles Toll Road and then returned to the eastbound DIAAH beyond the construction activity.  No toll will be charged to airport traffic.  The detour will be removed each night and the road will be restored to operation no later than 5 a.m. each day.
Why:     Herndon Station construction
 
Dulles International Airport Access Highway  East and West
 
When:   Friday, Feb. 16 - Saturday, Feb. 17, 9 p.m. to 5 a.m.
What:    Detours on eastbound DIAAH near the Dulles Airport Main Terminal
Where:  Between milemarker 0.0 and 0.4  (between Saarinen Circle and Rudder Road overpass) Detour:  Beginning at 9 p.m., between mile markers 0.0 and 0.4, eastbound and westbound DIAAH traffic will be reduced to a single lane. At 10 p.m., traffic approaching the Main Terminal, will be detoured to the Aviation Drive exit, cross over Aviation Drive, and back to the westbound DIAAH at Saarinen Circle.  Traffic leaving the Main Terminal will be detoured to the Aviation Drive ramp, cross over Aviation Drive and reenter the eastbound DIAAH.
Why:     Aerial guideway construction
 
Dulles International Airport Access Highway East
 
When:   Monday, Feb. 12 - Friday, Feb. 16, 8:30 a.m. to 3 p.m. and 6 p.m. to 5 a.m.
Saturday, Feb. 17, 5 a.m. to 2 p.m. and 6 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From Saarinen Circle to mile marker 5.7 (5/10 mile after the Reston Parkway overpass)
Why:     Civil work
 
Dulles International Airport Access Highway West
 
When:   Monday, Feb. 12 - Friday, Feb. 16, 7:30 a.m. to 2 p.m. and 7 p.m. to 5 a.m
Saturday, Feb. 17, 5 a.m. to 2 p.m. and 8 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 5.7 to 200 feet past the ramp to Copilot Way, including ramps (between the Rudder Road overpass and Saarinen Circle at Dulles Airport
Why:     Civil work and construction for Dulles Metrorail Station
 
When:   Thursday, Feb. 15, 9 a.m. to 2:30 p.m.
What:    Close right shoulder
Where: From Margarity Road to 1,000 feet after Chain Bridge Road
Why:     Survey for median design
 
Dulles Connector Road West
 
When:   Thursday, Feb. 15, 9 a.m. to 2:30 p.m.
What:    Close left shoulder
Where: From Margarity Road to 1,000 feet after Chain Bridge Road
Why:     Survey for median design
 
Dulles Greenway East
 
When:   Monday, Feb. 12 - Friday, Feb. 16, 10 a.m. to 6 p.m.
What:    Alternating right and left lane closures of varying lengths
Where:  Lane closures will be between mile marker 7.6 and 12.0 (from Broadlands Boulevard to the end of the ramp to the eastbound Dulles Greenway MainToll Plaza), short lane closures of varying lengths will occur.
Why:     Civil work
 
When:   Thursday, Feb. 15 - Friday, Feb. 16, 8 p.m. to 5 a.m.
What:    Double right lane closures
Where:  Lane closures will be between mile marker 10.0 and 12.0 (between the Loudoun County Parkway overpass and Dulles Greenway Main Toll Plaza), short lane closures of varying lengths will occur.
Why:     Aerial Guideway work
 
When:   Friday, Feb. 16 - Sunday, Feb. 18, 8 p.m. to midnight
What:    Double left lane closures
Where:  Lane closures will be between mile marker 7.8 and 9.2 (from east of Broadlands Boulevard overpass to 7/10 mile east of the Ashburn Village Boulevard overpass.
Why:     Ashburn Station tower crane removal
 
Dulles Greenway West
 
When:   Monday, Feb. 12 - Friday, Feb. 16, 6 a.m. to 3 p.m.
What:    Alternating right and left lane closures of varying lengths
Where:  Lane closures will begin approximately 3/10 mile west of the Main Toll Plaza and end near the Broadlands Boulevard overpass
Why:     Civil work
 
Moran Road/Lockridge Road North and South
 
When:   Monday, Feb. 12 - Thursday, Feb. 15, 9:30 a.m. to 3:30 p.m.
             Friday, Feb. 16, 9:30 a.m. to noon
What:    Right lane closed
Where:  From Old Ox Road to 1500 feet north of Lockridge/Moran Road intersection
Why:     Civil work
 
Herndon Parkway East
 
When:   Monday, Feb. 12 - Thursday, Feb. 15, 9:30 a.m. to 3:30 p.m.
             Friday, Feb. 16, 9:30 a.m. to noon
What:    Right lane closed
Where:  From 1000 feet east of Van Buren Street to 800 feet west of Exchange Place
Why:     Civil work
 
Old Ox Road East and West
 
When:   Monday, Feb. 12 - Thursday, Feb. 15, 9:30 a.m. to 3:30 p.m.
             Friday, Feb. 16, 9:30 a.m. to noon
What:    Right lane closed
Where:  From the 500 feet east of Moran Road to 500 feet west of Moran Road
Why:     Civil work
 
Sunset Hills Road East
 
When:   Monday, Feb. 12 - Thursday, Feb. 15, 9:30 a.m. to 3:30 p.m.
             Friday, Feb. 16, 9:30 a.m. to noon
What:    Right lane closed
Where:  From 400 feet west of Town Center Parkway to 600 feet east of Town Center Parkway
Why:     Civil work
                                                                    <><><><><>
 