Important Lane and Ramp Closures for the Week of Feb. 3 - Feb. 9
 
Dulles Corridor Metrorail Project crews continue construction activities for the Metrorail Silver Line Phase 2 that require lane, shoulder, and road closures and detours at locations along the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH), Dulles Greenway, Autopilot Drive, Herndon Parkway, Edmund Halley Drive, Sunrise Valley Drive, Sunset Hills Road, Lockridge Road, and Moran Road during the week of Feb. 3 - Feb. 9, 2019. In addition, there will be lane closures along the Phase 1 alignment as listed below.
 
See below for more specific dates, times and details and remember that all work is weather permitting.
 
PLEASE USE CAUTION and remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
 
<><><> 
 
Dulles Toll Road East
 
When:   Monday, Feb. 4, to Friday, Feb. 8, 10 a.m. to 3:30 p.m. and 9 p.m. to 5 a.m., and Saturday, Feb. 9, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 1.3 to 5.2 (from just west of the Route 28 overpass to the Reston Parkway overpass)
Why:     Civil work
 
Dulles Toll Road West
 
When:   Monday, Feb. 4, to Friday, Feb. 8, 9:00 a.m. to 3 p.m. and 8 p.m. to 5 a.m., and Saturday, Feb. 9, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 5.7 to 1.5 (between the Route 28 and Reston Parkway overpasses)
Why:     Civil work
 
Dulles International Airport Access Highway (DIAAH) East

When:   Monday, Feb. 4, to Friday, Feb. 8, 8:30 a.m. to 3 p.m. and 6 p.m. to 5 a.m., and Saturday, Feb. 9, 5 a.m. to 2 p.m. and 6 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 0.0 to 8.0 (from the Aviation Drive overpass to Hunter Mill Road)
Why:     Civil work
 
Dulles International Airport Access Highway (DIAAH) West
 
When:   Monday, Feb. 4, to Friday, Feb. 8, 7:30 a.m. to 2 p.m. and 7 p.m. to 5 a.m., and Saturday, Feb. 9, 5 a.m. to 2 p.m. and 8 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 7.3 to 0.0 (from approximately 7/10 mile west of Hunter Mill Road to approximately 200 feet beyond the Copilot Way ramp on Saarinen Circle near the Dulles Airport Terminal)
Why:     Civil and Dulles Airport Metrorail Station work will be taking place within the closures
 
Dulles Connector Road - East
 
When:   Monday, Feb. 4,  through Thursday, Feb. 7, 11 a.m. - 3 p.m., and Friday, Feb. 8,  11 a.m. - 2 p.m.
What:    Inside left lane and shoulder closure on a four-lane road
Where:  From Route 123/Dolley Madison Boulevard to I-66
Why:     Cleaning and storm drain work 
 
Dulles Connector Road - West
 
When:   Monday, Feb. 4,  through Thursday, Feb. 7, 9:30 a.m. - 3 p.m., and Friday, Feb. 8,  9:30 a.m. - 2 p.m.
What:    Inside left lane and shoulder closure on a four-lane road
Where:  From I-66 to Chain Bridge Road
Why:     Cleaning and storm drain work 
 
Dulles Greenway East
 
When:   Monday, Feb. 4 to Friday, Feb. 8, 10 a.m. to 6 p.m., and Saturday, Feb. 9, 6 a.m. to 6 p.m.
What:    Alternating left and right lane closures of varying lengths
Where:  From mile marker 7.6 to 14.0 (from approximately 2/10 mile west of Waxpool Road to the Dulles Toll Road)
Why:     Civil work
 
Dulles Greenway West
 
When:   Monday, Feb. 4 to Friday, Feb. 8, 6 a.m. to 3 p.m., and Saturday, Feb. 9, 6 a.m. to 6 p.m.
What:    Alternating left and right lane closures of varying lengths
Where:  From mile marker 12.2 to 7.6 (from the Moran Road exit to Broadlands Boulevard overpass)
Why:     Civil work
 
When:   Monday, Feb. 4 to Friday, Feb. 8, 7 a.m. to 2:45 p.m., and Saturday, Feb. 9, 7 a.m. to 3 p.m.
What:    Alternating left and right lane closures of varying lengths
Where:  From mile marker 11.0 to 10.5 (from
Why:     Civil work
 
Sunset Hills Road East
 
When: Monday, Feb.4 to Thursday, Feb. 7, 9:30 a.m. to 3:30 p.m., Friday, Feb. 8, 9:30 a.m. to 12 p.m.
What:    Alternating right and left lane closures
Where:  From 400 feet west of Town Center Pkwy to Bechtel Building Entrance
Why:     Civil work
 
Herndon Parkway East
 
When:   Monday, Feb.4 to Thursday, Feb. 7, 9:30 a.m. to 3:30 p.m., and Friday, Feb. 8, 9:30 a.m. to 12 p.m.
What:    Right lane closed
Where: From 1000 feet east of Van Buren Street to 800 feet west of Exchange Place
Why:     Equipment mobilization
 
Sunrise Valley Drive West
 
When:   Monday, Feb.4 to Thursday, Feb. 7, 9:30 a.m. to 3:30 p.m., and Friday, Feb. 8, 9:30 a.m. to 12 p.m.
What:    Right lane closed
Where: From Dulles Technology Drive to Dulles Station Blvd
Why:     Civil Work
 
When:   Monday, Feb.4 to Thursday, Feb. 7, 9:30 a.m. to 3:30 p.m., and Friday, Feb. 8, 9:30 a.m. to 12 p.m.
What:   Right lane closed
Where: From Thunder Chase Drive to Millburn Lane
Why:     Civil Work
 
When:   Monday, Feb.4 to Thursday, Feb. 7, 9:30 a.m. to 3:30 p.m., and Friday, Feb. 8, 9:30 a.m. to 12 p.m.
What:   Right lane closed
Where: From Reston Pkwy to 200' West of Edmund Halley Dr.
Why:     Civil Work
 
When:   Monday, Feb.4 to Thursday, Feb. 7, 9:30 a.m. to 3:30 p.m., and Friday, Feb. 8, 9:30 a.m. to 2 p.m.
What:   Right turn lane & Right lane closed
Where: Intersection of Sunrise Valley Drive and Reston Parkway
Why:     Civil Work
 
Edmund Halley Drive North and South
 
When:   Monday, Feb.4 to Thursday, Feb. 7, 9:30 a.m. to 3:30 p.m., and Friday, Feb. 8, 9:30 a.m. to 12 p.m.
What:    Right shoulder closed
Where:  From Sunrise Valley Drive to 1000 feet north of Sunrise Valley Drive
Why:     Civil utility work
 
Moran Road South
 
When:   Monday, Feb.4 to Thursday, Feb. 7, 9:30 a.m. to 3:30 p.m., and Friday, Feb. 8, 9:30 a.m. to 12 p.m.
What:    Alternating left and right lane closures
Where:  From Moran Road to Old Ox Road
Why:     Civil work
 
Route 7- East
 
When:   Monday, Feb. 4,  through Thursday, Feb. 7, 9:30 a.m. - 3 p.m.
Friday,  Feb. 8, 9:30 a.m. - 2 p.m.
What:    Left lane and right lane closure
Where:  From Route 267 Ramp to Chain Bridge Road
Why:     Installing pipe repair bands and spot repairs
 
Route 7- West

When:   Monday, Feb. 4,  through Thursday, Feb. 7, 9:30 a.m. - 3 p.m.
Friday,  Feb. 8, 9:30 a.m. - 2 p.m.
What:    Left lane and right lane closure
Where:  From Chain Bridge Road to Route 267 ramp
Why:     Installing pipe repair bands and spot repairs
<><><><><>
 