Skip to main content
Silver Line on Track

Important Lane and Ramp Closures for the Week of May 19 - May 25

May 17, 2019                                                                                        
                                                                                     
CONTACT:Marcia McAllister
                  T: 703-572-0506
                  C: 571-730-9117
                  marcia.mcallister@dullesmetro.com
 
Important Lane and Ramp Closures for the Week of May 19 - May 25
 
Dulles Corridor Metrorail Project crews continue construction activities for the Metrorail Silver Line Phase 2 that require lane, shoulder, and road closures and detours at locations along the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH), Dulles Greenway, Autopilot Drive, Herndon Parkway, Edmund Halley Drive, Sunrise Valley Drive, Sunset Hills Road, Lockridge Road, and Moran Road during the week of May 19 - May 25, 2019.
 
See below for more specific dates, times and details and remember that all work is weather permitting.
 
PLEASE USE CAUTION and remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
 
<><><> 
Dulles Toll Road East
When:   Monday, May 20 to Thursday, May 23, 10 a.m. to 3:30 p.m. and 9 p.m. to 5 a.m., and Friday, May 24, 10 a.m. to 12 p.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 1.3 to 5.2 (from just west of the Route 28 overpass to the Reston Parkway overpass)
Why:     Civil work
 
Dulles Toll Road West
When:   Monday, May 20 to Thursday, May 23, 9:00 a.m. to 3 p.m. and 8 p.m. to 5 a.m., and Friday, May 24, 10 a.m. to 12 p.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 5.7 to 1.5 (between the Route 28 and Reston Parkway overpasses)
Why:     Civil work
 
Dulles International Airport Access Highway (DIAAH) East
When:   Monday, May 20 to Thursday, May 23, 8:30 a.m. to 3 p.m. and 6 p.m. to 5 a.m., and Friday, May 24, 8:30 a.m. to 12 p.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 0.0 to 8.0 (from the Aviation Drive overpass to Hunter Mill Road)
Why:     Civil work
 
When:   Monday, May 20 to Saturday, May 25, 12 a.m. to 11:59 p.m.
What:    Left shoulder closure
Where:  From mile marker 3.5 to 5.5 (from Van Buren Street to 3/10 mile east of Reston Parkway)
Why:     Storm sewer flushing
 
Dulles International Airport Access Highway (DIAAH) West
When:   Monday, May 20 to Thursday, May 23, 7:30 a.m. to 2 p.m. and 7 p.m. to 5 a.m., and Friday, May 24, 7:30 a.m. to 12 p.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 7.3 to 0.0 (from approximately 7/10 mile west of Hunter Mill Road to approximately 200 feet beyond the Copilot Way ramp on Saarinen Circle near the Dulles Airport Terminal)
Why:     Civil and Dulles Airport Metrorail Station work will be taking place within the closures
 
When:   Monday, May 20 to Thursday, May 23, 10 p.m. to 5 a.m.
What:    Alternating right and left lane closures of varying lengths
Where:  From mile marker 1.3 to approximately 300 feet beyond the Copilot Way ramp on Saarinen Circle near the Dulles Airport Terminal
Why:     Civil work, Paving, Dulles Station work
 
When:   Monday, May 20 to Friday, May 24, 12 a.m. to 11:59 p.m.
What:    Left shoulder closure
Where:  From mile marker 3.5 to 5.5 (from Van Buren Street to 3/10 mile east of Reston Parkway)
Why:     Storm sewer flushing
 
Dulles Connector Road - East
When:  Monday, May 20, through Thursday, May 23, 11 a.m. - 3 p.m.
What:   Left lane closure
Where: From 500 feet before Margarity Road Overpass to 2500 feet after Margarity Road Overpass
Why:    Grading for drainage
 
Dulles Greenway East
When:   Monday, May 20 to Friday, May 24, 10 a.m. to 6 p.m., 6 p.m. to 5 a.m.
What:    Alternating left and right lane closures of varying lengths
Where:  From mile marker 7.6 to 14.0 (from approximately 2/10 mile west of Waxpool Road to the Dulles Toll Road)
Why:     Civil work
 
Dulles Greenway West
When:   Monday, May 20 to Friday, May 24, 6 a.m. to 3 p.m
What:    Alternating left and right lane closures of varying lengths
Where:  From mile marker 12.2 to 7.6 (from the Moran Road exit to Broadlands Boulevard overpass)
Why:     Civil work
 
Rudder Road North and South
When:   Monday, May 20 to Thursday, May 23, 7:30 a.m to 5 p.m., and Friday, May 24, 7:30 a.m. to 12 p.m.
What:    Ramp narrows
Where:  From 1000' before Rudder Road bridge to the end of Rudder Road bridge
Why:     Bridge fence installation 
 
Herndon Parkway East
When:   Monday, May 20 to Thursday, May 23, 9:30 a.m. to 3:30 p.m., and Friday, May 24, 9:30 a.m. to 12 p.m.
What:    Right lane closed
Where: From 1000 feet east of Van Buren Street to 800 feet west of Exchange Place
Why:     Equipment mobilization
 
Sunrise Valley Drive West
When:   Monday, May 20 to Thursday, May 23, 9:30 a.m. to 3:30 p.m., and Friday, May 24, 9:30 a.m. to 12 p.m.
What:    Right lane closed
Where: From Dulles Technology Drive to Dulles Station Blvd
Why:     Civil Work
 
When:   Monday, May 20 to Thursday, May 23, 9:30 a.m. to 3:30 p.m., and Friday, May 24 9:30 a.m. to 12 p.m.
What:    Right lane closed
Where: From Thunder Chase Drive to Colts Brook Drive
Why:     Civil Work
 
When:   Monday, May 20 to Thursday, May 23, 9:30 a.m. to 3:30 p.m., and Friday, May 24, 9:30 a.m. to 12 p.m.
What:    Right lane closed
Where: From Reston Pkwy to 200' West of Edmund Halley Dr.
Why:     Civil Work 
 
When:   Monday, May 20 to Thursday, May 23, 9:30 a.m. to 3:30 p.m., and Friday, May 24, 9:30 a.m. to 12 p.m.
What:    Right turn lane & Right lane closed
Where: Intersection of Sunrise Valley Drive and Reston Parkway
Why:     Civil Work
 
Sunset Hills Road East
When: Monday, May 20 to Thursday, May 23, 9:30 a.m. to 3:30 p.m., and Friday, May 24, 9:30 a.m. to 12 p.m.
What:    Alternating right and left lane closures
Where:  From 400 feet west of Town Center Pkwy to Bechtel Building Entrance
Why:     Civil work
 
Edmund Halley Drive North and South
When:   Monday, May 20 to Thursday, May 23, 9:30 a.m. to 3:30 p.m., and Friday, May 24, 9:30 a.m. to 12 p.m.
What:    Right shoulder closed
Where:  From Sunrise Valley Drive to 1000 feet north of Sunrise Valley Drive
Why:     Civil utility work
 
Moran Road South
When:   Monday, May 20 to Thursday, May 23, 9:30 a.m. to 3:30 p.m., and Friday, May 24, 9:30 a.m. to 12 p.m.
What:    Alternating left and right lane closures
Where:  From Moran Road to Old Ox Road
Why:     Civil work
 
Old Ox Road East and West
When:   Monday, May 20 to Thursday, May 23, 9:30 a.m. to 3:30 p.m., and Friday, May 24, 9:30 a.m. to 12 p.m.
What:    Left lane closure
Where:  From 1000' east of Moran Rd to the Dulles Greenway NB On-Ramp
Why:     Curb Repairs
 
When:   Monday, May 20 to Thursday, May 23, 9:30 a.m. to 3:30 p.m., 10 p.m. to 4 p.m., and Friday, May 24, 9:30 a.m. to 12 p.m.
What:    Right lane closure
Where:  From 1000' east of Old Ox Road bridge to 1000' west of bridge
Why:     Curb Repairs
 
Lockridge Road North and South
When:   Monday, May 20 to Sunday, May 26,12 a.m. to 11:59 p.m.
What:    Road closure
Where:  From Dulles North Transit Center Park & Ride to Prentice Drive
Why:     Civil work
 
Old Meadow Road - East
When:  Monday, May 20, through, Thursday, May 23, 9 a.m. - 3:30 p.m.
Friday,  May 24, 9 a.m. - 12 p.m.
What:   Right lane closure
Where: From Route 123 to Colshire Meadow Road
Why:    Utility relocation work
 
Route 123 - South 
When:  Monday, May 20, through, Thursday, May 23, 9 a.m. - 3:30 p.m.
Friday,  May 24, 9 a.m. - 12 p.m.
What:    Left turn lane closure
Where:  From 200 feet before Old Meadow Road to Old Meadow Road
Why:     Utility relocation work
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.