Skip to main content
Silver Line on Track

Important Lane and Ramp Closures for the Week of Nov. 4 - Nov. 10

November 2, 2018
                                                                   
 
 
CONTACT: Marcia McAllister
                    T: 703-572-0506
                    C: 571-730-9117
                    marcia.mcallister@dullesmetro.com
 
 
Important Lane and Ramp Closures for the
Week of Nov. 4 - Nov. 10
 
Dulles Corridor Metrorail Project crews continue construction activities for the Metrorail Silver Line Phase 2 that require lane, shoulder, and road closures and detours at locations along the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH), Dulles Greenway, Autopilot Drive, Herndon Parkway, Edmund Halley Drive, Sunrise Valley Drive and Sunset Hills Road during the week of Nov. 4 - Nov. 10, 2018.
 
See below for more specific dates, times and details and remember that all work is weather permitting.
 
PLEASE USE CAUTION and remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. Slow-moving vehicles and equipment may be entering and exiting the highways and surrounding roads.
 
<><><> 
Dulles Toll Road East
 
When:  Monday, Nov. 5 - Friday, Nov. 9, 10 a.m. to 3:30 p.m. and 9 p.m. to 5 a.m.
            Saturday, Nov. 10, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.
What:   Alternating right and left lane closures of varying lengths
Where:From mile marker 1.3 to 5.2 (from just west of the Route 28 overpass to the Reston Parkway overpass)
Why:    Civil work
 
Dulles Toll Road West
 
When:  Monday, Nov. 5 - Friday, Nov. 9, 9:30 a.m. to 3 p.m. and 8 p.m. to 5 a.m.
            Saturday, Nov. 10, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.
What:   Alternating right and left lane closures of varying lengths
Where:From mile marker 5.7 to 1.5 (between the Route 28 and Reston Parkway overpasses)
Why:    Civil work
 
Dulles International Airport Access Highway (DIAAH) East
 
When:  Monday, Nov. 5 - Friday, Nov. 9, 8:30 a.m. to 3 p.m. and 6 p.m. to 5 a.m.
            Saturday, Nov. 10, 5 a.m. to 2 p.m. and 6 p.m. to 5 a.m.
What:   Alternating right and left lane closures of varying lengths
Where:From mile marker 0.0 to 5.7 (from the Aviation Drive overpass to 5/10 mile after the Reston Parkway overpass)
Why:    Civil work
 
Dulles International Airport Access Highway (DIAAH) West
 
When:  Monday, Nov. 5 - Friday, Nov. 9, 7:30 a.m. to 2 p.m. and 7 p.m. to 5 a.m.
            Saturday, Nov. 10, 5 a.m. to 2 p.m. and 8 p.m. to 5 a.m.
What:   Alternating right and left lane closures of varying lengths
Where:From mile marker 7.3 to 0.0 (from approximately 7/10 mile west of Hunter Mill Road to approximately 200 feet beyond the Copilot Way ramp on Saarinen Circle near the Dulles Airport Terminal)
Why:    Civil and Dulles Airport Metrorail Station work will be taking place within the closures
 
Dulles Greenway East
 
When: Monday, Nov. 5 - Friday, Nov. 9, 10 a.m. to 6 p.m.
Saturday, Nov. 10, 6 a.m. to 6 p.m.
What:   Alternating left and right lane closures of varying lengths
Where:From mile marker 7.6 to 14.0 (from approximately 2/10 mile west of Waxpool Road to Route 28 overpass)
Why:    Civil work
 
When:  Monday, Nov. 5 - Friday, Nov. 9, 10 a.m. to 8 p.m.
            Saturday, Nov. 10, 6 a.m. to 8 p.m.
What:   Alternating double left and right lane closures with 20 min stoppages
Where:From mile marker 8.4 to 9.5 ( From Ashburn Village Blvd to Loudoun County Parkway)
Why:    Milling
 
Dulles Greenway West
 
When: Monday, Nov. 5 - Friday, Nov. 9, 6 a.m. to 3 p.m.
Saturday, Nov. 10, 6 a.m. to 6 p.m.
What:   Alternating left and right lane closures of varying lengths
Where:From mile marker 12.2 to 7.6 (from approximately 3/10 mile west of the Main Toll Plaza to Broadlands Boulevard overpass)
Why:    Civil work
 
When: Friday, Nov. 9, 7 a.m. to 2:45 p.m.
What:   Alternating double left and right lane closures with 20 minute ramp stoppages
Where:From mile marker 9.2 to 8.6 (from 772 Station to Ashburn Village Blvd)
Why: Remove barrier 
 
Sunset Hills Road East
 
When: Monday, Nov. 5 - Thursday, Nov. 8, 9:30 a.m. to 3:30 p.m..
Friday, Nov. 10, 9:30 a.m. to noon p.m.
What:   Alternating right and left lane closures
Where:From 400 feet west of Town Center Pkwy to Bechtel Building Entrance
Why:    Civil work
 
Herndon Parkway East
 
When: Monday, Nov. 5 - Thursday, Nov. 8, 9:30 a.m. to 3:30 p.m..
Friday, Nov. 10, 9:30 a.m. to noon p.m.
What:   Right lane closed
Where: From 1000 feet east of Van Buren Street to 800 feet west of Exchange Place
Why:    Equipment mobilization
 
Sunrise Valley Drive West
 
When: Monday, Nov. 5 - Thursday, Nov. 8, 9:30 a.m. to 3:30 p.m..
Friday, Nov. 9, 9:30 a.m. to noon p.m.
What: Right lane closed
Where: From Thunder Chase Drive to Millburn Lane
Why: Civil Work
 
When: Monday, Nov. 5 - Thursday, Nov. 8, 9:30 a.m. to 3:30 p.m..
Friday, Nov. 9, 9:30 a.m. to noon p.m.
What: Right lane closed
Where: From Dulles Technology Drive to Dulles Station Boulevard
Why: Civil Work
 
Edmund Halley Drive North and South
 
When: Monday, Nov. 5 - Thursday, Nov. 8, 9:30 a.m. to 3:30 p.m..
Friday, Nov. 9, 9:30 a.m. to noon p.m.
What:   Right shoulder closed
Where:From Sunrise Valley Drive to 1000 feet north of Sunrise Valley Drive
Why:    Civil utility work
 
Moran Road South
 
When: Monday, Nov. 5 - Thursday, Nov. 8, 9:30 a.m. to 3:30 p.m..
Friday, Nov. 9, 9:30 a.m. to noon p.m.
What:   Right shoulder closed
Where:From Moran Road to Old Ox Road
Why:    Civil work
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.