Skip to main content
Silver Line on Track

Weekend Traffic Reminder for Nov. 4 - 6

November 4, 2016
 
CONTACT: Marcia McAllister
                  T: 703-572-0506
                  C: 571-730-9117
                  marcia.mcallister@dullesmetro.com
 
DULLES CORRIDOR METRORAIL PROJECT - PHASE 2
Lane Closures and Detours Overnight This Weekend on the Dulles International Airport Access Highway, Dulles Greenway and Airport Roads- Friday, Nov. 4 through Sunday, Nov. 6
 

Night time construction activities will take place on Friday, Nov. 4 – Sunday, Nov. 6, causing lane and road closures on the Dulles Toll Road, Dulles International Airport Access Highway, Dulles Greenway, Aviation Drive/Cargo Drive, Autopilot Drive and Rudder Road.

 

Drivers are asked to use caution, remain attentive to all signage, barricades and speed limits, and obey all police and flagger instructions. 

 
All work is weather dependent.
 

Dulles Toll Road West

 

When:   Friday, Nov. 4, 8 p.m. to 5 a.m.

What:    Left lane closed; slip ramp to the westbound DIAAH at mile marker 1.8 will remain open.

Where:  From mile marker 2.5 to 1.8 (from the Centreville Road bridge to 6/10 mile before the Route 28 overpass)

Why:    Jack and bore operations

 

Dulles International Airport Access Highway (DIAAH) East

 

When:   Friday, Nov. 4 – Saturday, Nov. 5, 6 p.m. to 5 a.m.

What:    Left lane closed

Where:  From mile marker 3.2 to 3.9 (from 2/10 mile before the Monroe Street overpass to 3/10 mile before the Fairfax County Parkway overpass)

Why:     Construction entrance acceleration/deceleration lane

 

Dulles International Airport Access Highway (DIAAH) West

 

When:   Friday, Nov. 4, 7 p.m. to 5 a.m.

What:    Right lane closed

Where:  From mile marker 2.5 to 1.8 (from the Centreville Road bridge to 6/10 mile before the Route 28 overpass)

Why:     Jack and bore operations

 

Dulles Greenway East

 

When:   Friday, Nov. 4, - Saturday, Nov. 5 10 p.m. to 4 a.m. 

What:    Two right lanes OR two left lanes closed as needed

Where:  From mile marker 10.6 to 12.0 (from the Broad Run bridge to 4/10 mile before the mainline toll plaza)

Why:     Installation of a concrete span across the eastbound Dulles Greenway

 

Aviation Drive West/Cargo Drive South

 

When:   Friday, Nov. 4, 6 p.m. to 5 a.m.

What:    Two right lanes and turn lane closed

Where:  From 300 feet west of Autopilot Drive to 300 feet south of Cargo Drive (along the transition from westbound Aviation Drive to southbound Cargo Drive)

Why:     Duct bank work

 

Autopilot Drive North and South

 

When:   Friday, Nov. 4 – Saturday, Nov. 5, 9 p.m. to 5 a.m.

What:    Alternating left or right lane closures

Where:  From Rudder Road to 700 feet north of Rudder Road (near Dollar/Thrifty entrance). 

Why:     Aerial guideway construction

 

Rudder Road East and West

 

When:   Friday, Nov. 4, 9 p.m. to 5 a.m.

What:    Eastbound and westbound lanes closed

Where:  From Autopilot Drive to Air Freight Lane. Follow detour to Package Court.

Why:     Duct bank work

 

<><><><><> 
 
A 24/7 Hotline is available for Dulles Corridor Metrorail Project Phase 2 construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.