Skip to main content
Silver Line on Track

Alternating Double Lane Closures on Eastbound Dulles Toll Road Planned Friday, Oct. 28 at 9 p.m. through Saturday, Oct. 29 at 3 p.m.

October 26, 2016
  
CONTACT:    Marcia McAllister                                                                
                      T: 703-572-0506                                                                  
                      C: 571-730-9117
                      Marcia.McAllister@dullesmetro.com
 
  Alternating Double Lane Closures on Eastbound Dulles Toll Road    
  Planned Friday, Oct. 28 at 9 p.m. through Saturday, Oct. 29 at 3 p.m.
On or about Friday, Oct. 28 at 9 p.m. to Saturday, Oct. 29 at 3 p.m., Dulles Corridor Metrorail Project crews will stripe lanes and ramps on the eastbound Dulles Toll Road (DTR) between mile markers 2.9 and 4.2. Double lane closures will occur, alternating from double right lane closures to double left lane closures as the work progresses. Ramps in the area will narrow as striping occurs along the ramps.
The Herndon-Monroe Park & Ride facility and the ramp to the Fairfax County Parkway will remain available throughout the operation.
Drivers should exercise caution and pay attention to barrier and signage.
All work is weather dependent and subject to change.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
<><><><><> 
 
A 24/7 emergency hotline is available for Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. 
 
For general project information: www.dullesmetro.com or 703-572-0506.