Skip to main content
Silver Line on Track

CANCELLED: Nighttime Detour of Eastbound Dulles Toll Road Friday, Jan. 12 at 10 p.m. through Saturday, Jan. 13 at 5 a.m.

Jan. 8, 2018
 
 
CONTACT:   Marcia McAllister                                                                
                    T: 703-572-0506                                                                  
                    C: 571-730-9117
                    Marcia.McAllister@dullesmetro.com
 
CANCELLED: Nighttime Detour of Eastbound Dulles Toll Road
Friday, Jan. 12 at 10 p.m. through Saturday, Jan. 13 at 5 a.m.
 
On or about Friday, Jan. 12 at 10 p.m. through Saturday, Jan. 13, at 5 a.m., the eastbound Dulles Toll Road (DTR) will be diverted to the eastbound Dulles International Airport Access Highway (DIAAH) between Route 28 and the Fairfax County Parkway while Dulles Corridor Metrorail Project crews continue construction of the pedestrian bridge that will provide access over the eastbound Dulles Toll Road to the Silver Line's Innovation Center Metrorail Station. See details below and on the next page.
 Friday, Jan. 12, 10 p.m. - Saturday, Jan. 13, 5 a.m.:
  • The left lane of the ramp from the eastbound Dulles Greenway to the eastbound DTR will be closed, and 20-minute stoppages of the right lane of the ramp from the eastbound Dulles Greenway to the eastbound DTR will occur.
  • The eastbound DTR will be diverted to the eastbounThe d DIAAH near mile marker 1.7, just after the mainline toll booth. Eastbound DTR traffic will return to the toll road lanes near mile marker 2.7.
  • The slip ramp from the eastbound DIAAH to the eastbound DTR at mile marker 1.8 (east of the Route 28 overpass and mainline toll booth) will be closed. 
 
 
 
 
 
 
 
 
 
 
 
Figure 1:  Eastbound DTR Traffic will be diverted to the eastbound DIAAH.
All work is weather dependent and subject to change.
Drivers are asked to use caution and pay attention to all signage, barricades and police instructions. Large, slow-moving vehicles may be exiting and entering the highway at various times.                
                                                                                  
                                                                   <><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.