Skip to main content
Silver Line on Track

REMINDER: Eastbound Dulles Access Highway Traffic to be detoured to Eastbound Dulles Toll Road for Pedestrian Bridge Utility Work Friday, Jan. 18, 10 p.m. through Saturday, Jan. 19, 5 a.m.

January 18, 2019
 
 
CONTACT:  Marcia McAllister                                                                
                     T: 703-572-0506                                                                  
                     C: 571-730-9117
                     Marcia.McAllister@dullesmetro.com
 
REMINDER: Eastbound Dulles Access Highway Traffic to be detoured to Eastbound Dulles Toll Road for Pedestrian Bridge Utility Work
Friday, Jan. 18, 10 p.m. through Saturday, Jan. 19, 5 a.m.
Beginning on or about Friday, Jan. 18 at 10 p.m. and continuing until Saturday, Jan. 19 at 5 a.m., Dulles Corridor Metrorail Project (DCMP) crews will be performing utility work at the pedestrian bridges of Herndon Station, requiring the full closure of a portion of the eastbound Dulles International Airport Access Highway (DIAAH).
At mile marker 2.7, traffic will be redirected to the left lane of the westbound Dulles Toll Road (DTR) from the Dulles International Airport Access Highway (DIAAH). There will be a second left DTR lane closed as a buffer. At mile marker 4.0, near Fairfax County Parkway, traffic will be able to re-enter the DIAAH. See graphic below.
All work is weather dependent and subject to change.
Drivers are asked to use caution and pay attention to all signage and barricades. Large, slow-moving vehicles may be exiting and entering the highway at various times.
 <><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.