Skip to main content
Silver Line on Track

REMINDER: Westbound Dulles Access Highway Traffic to be Detoured for Pedestrian Bridge Utility Work Saturday, March 2, 10 p.m. through Sunday, March 3, 5 a.m.

February 26, 2019
 
CONTACT: Marcia McAllister                                                                
                   T: 703-572-0506                                                                  
                   C: 571-730-9117
                   Marcia.McAllister@dullesmetro.com
 
REMINDER: Westbound Dulles Access Highway Traffic to be Detoured for Pedestrian Bridge Utility Work
Saturday, March 2, 10 p.m. through Sunday, March 3, 5 a.m.
 
Beginning on or about Saturday, March 2 at 10 p.m. and continuing until Sunday, March 3 at 5 a.m., Dulles Corridor Metrorail Project (DCMP) crews will be performing utility work at the pedestrian bridges of Reston, Innovation and Herndon Station, requiring the full closure of a portion of the westbound Dulles International Airport Access Highway (DIAAH). 
At mile marker 9.1, near Centreville Road, traffic will be redirected to the left lane of the westbound Dulles Toll Road (DTR) from the Dulles International Airport Access Highway (DIAAH). There will be a second left DTR lane closed as a buffer. At mile marker 1.8, near the Route 28 toll plaza, traffic will be able to re-enter the DIAAH towards the airport. The ramps to the westbound DIAAH at mile marker 8.3 and 3.3 will be closed. See graphics below.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
All work is weather dependent and subject to change. Drivers are asked to use caution and pay attention to all signage and barricades. Large, slow-moving vehicles may be exiting and entering the highway at various times.
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.