Skip to main content
Silver Line on Track

Triple Left Lane Closure with 20 Minute Stoppages on Eastbound Dulles Toll Road for Pedestrian Bridge Work Monday, May 13 at 10 p.m. until Tuesday, May 14 at 5 a.m.

May 10, 2019
 
 
CONTACT:  Marcia McAllister                                                                
                   T: 703-572-0506                                                                  
                   C: 571-730-9117
                   Marcia.McAllister@dullesmetro.com
 
Triple Left Lane Closure with 20 Minute Stoppages on Eastbound Dulles Toll Road for Pedestrian Bridge Work
Monday, May 13 at 10 p.m. until Tuesday, May 14 at 5 a.m.
Beginning on or about Monday, May 13 at 10 p.m. and continuing through Tuesday, May 14 at 5 a.m., Dulles Corridor Metrorail Project (DCMP) crews will be performing pedestrian bridge work along the eastbound Dulles Toll Road (DTR), requiring the full closure of three left lanes beginning at mile marker 2.0, just east of Innovation Center Station, and continuing through mile marker 3.7 to Herndon Station. Traffic from the eastbound DTR should be aware of the change in pattern and can expect up to 20 minute full stoppages coordinated by MWAA Police to take place on the DTR as well as the ramp from the eastbound Dulles Greenway. See map below.
All work is weather dependent and subject to change. Drivers are asked to use caution and pay attention to all signage and barricades. Large, slow-moving vehicles may be exiting and entering the highway at various times.
 
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.