Skip to main content
Silver Line on Track

Triple Left Lane Closure with 20 Minute Stoppages on Westbound Dulles Toll Road for Pedestrian Bridge Utilities Thursday, Dec. 20 at 10 p.m. until Friday, Dec. 21 at 5 a.m.

December 17, 2018
 
 
CONTACT: Marcia McAllister                                                                
                    T: 703-572-0506                                                                  
                    C: 571-730-9117
                    Marcia.McAllister@dullesmetro.com
 
Triple Left Lane Closure with 20 Minute Stoppages on Westbound Dulles Toll Road for Pedestrian Bridge Utilities
Thursday, Dec. 20 at 10 p.m. until Friday, Dec. 21 at 5 a.m.
 
Beginning on or about Thursday, Dec. 20 at 10 p.m. and continuing through Friday, Dec 21 at 5 a.m., Dulles Corridor Metrorail Project (DCMP) crews will be performing pedestrian bridge utility work along the westbound Dulles Toll Road (DTR), requiring the full closure of three left lanes beginning at mile marker 5.1 on the east end of Reston Station, and continuing through mile marker 3.6 to Herndon Station. Traffic from the westbound DTR should be aware of the change in pattern and can expect up to 20 minute full stoppages (see image below).
 
 
All work is weather dependent and subject to change. Drivers are asked to use caution and pay attention to all signage and barricades. Large, slow-moving vehicles may be exiting and entering the roadways at various times.  
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.