Skip to main content
Silver Line on Track

Triple Left Lane Closure with 20 Minute Stoppages on Westbound Dulles Toll Road for Pedestrian Bridge Utilities Tuesday, March 26, 10 p.m. to Wednesday, March 27, 5 a.m.

March 22, 2019
 
 
CONTACT:  Marcia McAllister                                                                
                    T: 703-572-0506                                                                  
                    C: 571-730-9117
                    Marcia.McAllister@dullesmetro.com
 
Triple Left Lane Closure with 20 Minute Stoppages on Westbound Dulles Toll Road for Pedestrian Bridge Utilities
Tuesday, March 26, 10 p.m. to Wednesday, March 27, 5 a.m.
 
Beginning on or about Tuesday, March 26 at 10 p.m. to Wednesday, March 27 at 5 a.m., Dulles Corridor Metrorail Project (DCMP) crews will be performing pedestrian bridge utility work along the westbound Dulles Toll Road (DTR), requiring the full closure of three left lanes beginning at mile marker 6.4 just east end of Wiehle Ave, and continuing through mile marker 4.8 to the west end of Reston Station. Traffic from the westbound DTR should be aware of the change in pattern and can expect up to 20 minute full stoppages (see image below).
 
 
All work is weather dependent and subject to change. Drivers are asked to use caution and pay attention to all signage and barricades. Large, slow-moving vehicles may be exiting and entering the highway at various times.
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.