Skip to main content
Silver Line on Track

Triple Right Lane Closure and Detour on Eastbound Dulles Toll Road for Pedestrian Bridge Utilities Saturday, Feb. 23 at 10 p.m. until Sunday, Feb. 24 at 7 a.m.

February 19, 2019
                                                                       
 
CONTACT:    Marcia McAllister
                      T: 703-572-0506
                      C: 571-730-9117
                      marcia.mcallister@dullesmetro.com
 
Triple Right Lane Closure and Detour on Eastbound Dulles Toll Road for Pedestrian Bridge Utilities
Saturday, Feb. 23 at 10 p.m. until Sunday, Feb. 24 at 7 a.m.
 
Beginning on or about Saturday, Feb. 23 at 10 p.m. and continuing through Sunday, Feb. 24 at 7 a.m., Dulles Corridor Metrorail Project (DCMP) crews will be performing pedestrian bridge utility work along the eastbound Dulles Toll Road (DTR), requiring the full closure of three left lanes beginning at mile marker 1.5, just east of the Route 28 toll plaza, and continuing through mile marker 2.2 to the east end of Innovation Station. Traffic from the eastbound DTR will be detoured onto the eastbound DIAAH and should be aware of the change in pattern (see map below). There will be temporary crossovers in place to assist traffic in exiting and re-entering the DTR.

 
All work is weather dependent and subject to change.
 
Signs and barrels will be used to help direct traffic and minimize impacts.  Drivers should use extreme caution in the areas and allow extra time to travel in these areas.
 
                                                                    <><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.