Skip to main content
Silver Line on Track

UPDATE: Full Closure of Westbound Sunrise Valley Drive for Sanitary Pipe Repairs Saturday, March 16, 5 a.m. through Sunday, March 17 at 5 p.m.

March 15, 2019
 
 
CONTACT:  Marcia McAllister                                                                
                   T: 703-572-0506                                                                  
                   C: 571-730-9117
                   Marcia.McAllister@dullesmetro.com
 
 
UPDATE: Full Closure of Westbound Sunrise Valley Drive for Sanitary Pipe Repairs
Saturday, March 16, 5 a.m. through
Sunday, March 17 at 5 p.m.

Beginning on or about Saturday, March 16 at 5 a.m. and continuing through Sunday, March 17 at 5 p.m., Dulles Corridor Metrorail Project (DCMP) crews will be performing sanitary pipe repairs that will require a full closure of a portion of westbound Sunrise Valley Drive. During this time, westbound traffic will be detoured to the eastbound side resulting in one travel lane in each direction. Traffic should be aware of the change in pattern. (Note change in date)
 
 
All work is weather dependent and subject to change. Drivers are asked to use caution and pay attention to all signage and barricades. Large, slow-moving vehicles may be exiting and entering the highway at various times.
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.