Skip to main content
Silver Line on Track

Westbound Sunrise Valley Drive Closure Scheduled for Sanitary Pipe Repairs Friday, March 15, 10 p.m. through Monday, March 18, 4 a.m.

March 6, 2019
 
 
CONTACT: Marcia McAllister                                                                
                   T: 703-572-0506                                                                  
                   C: 571-730-9117
                   Marcia.McAllister@dullesmetro.com
 
Westbound Sunrise Valley Drive Closure Scheduled for Sanitary Pipe Repairs
Friday, March 15, 10 p.m. through Monday, March 18, 4 a.m.
Beginning on or about Friday, March 15 at 10 p.m. through Monday, March 18 at 4 a.m., portions of travel lanes along Sunrise Valley Drive near the future Innovation Metrorail Station will shift to one travel lane for each direction of eastbound and westbound traffic. 
Dulles Corridor Metrorail Project (DCMP) crews will be making sanitary pipe repairs that will require a full closure of a portion of westbound Sunrise Valley, forcing westbound traffic to be detoured to the eastbound side resulting in one travel lane in each direction east of Route 28 and west of Herndon. Drivers should watch for signage and barricades in this area.
 
All work is weather dependent and subject to change. Drivers are asked to use caution and pay attention to all signage and barricades. Large, slow-moving vehicles may be exiting and entering the highway at various times.
<><><><><>
 
A 24/7 emergency hotline is available for Phase 2 Dulles Corridor Metrorail Project construction-related issues: 844-385-7245. For general project information: www.dullesmetro.com or 703-572-0506.