Addendum to Final Alternative Analysis Report

Introduction

Alternatives Considered Between the Publication of the FAAR and Draft EIS

  • BRT Alternatives
  • Metrorail Alternatives
  • Phased Implementation Alternative
  • Ancillary Facilites
  • Tysons West Station Location

 

Alternatives Considered Based on Public Comments Based on the Draft EIS

  • Dulles Plan B
  • Metrorail Alternative

 

Alternatives Evaluated in the Supplemental Draft EIS

  • No Build Alternative
  • Metrorail Alternative (T6/Y15)
  • Locally Preferred Alternative

 

Alternative Locations and Site Plans of Three Project Facilities

  • Traction Power Substation #2
  • Tie-Breaker Station #2
  • Tysons West Station Entrance and Facilities

 

Alternatives Carried Forward in the final EIS

  • No Build Alternative
  • Locally Preferred Alternative

 

 

Appendices

Appendix A

  • Alignments BRT 2 and BRT 3
  • T9 Revised
  • Station Convertibility
  • Supplemental Metrorail Yard Study

 

Appendix B

  • Dulles Plan B - Summary of Response to Comments
  • Alignment T12
  • Alignment T13
  • Alignment T14

 

Appendix C

  • Construction Phasing

 

Appendix D

  • Traction Power Substation #2
  • Tie Breaker Station #2
  • Tysons West Station Entrance and Facilities

 

Appendix E

  • Comparison of Draft EIS Baseline and Final EIS No Build

 

Appendix F

  • Final Team Recommendations